基于考虑时间效应UH模型的高铁地基蠕变沉降数值模拟

Wei Chen, Naidong Wang, Hongye Yan, Feng Chen, Qian-li Zhang
{"title":"基于考虑时间效应UH模型的高铁地基蠕变沉降数值模拟","authors":"Wei Chen, Naidong Wang, Hongye Yan, Feng Chen, Qian-li Zhang","doi":"10.3208/jgssp.v08.c02","DOIUrl":null,"url":null,"abstract":"The high-speed railway has strict restrictions on the settlement of the roadbed, and the settlement value must not exceed 15mm. In the process of calculating the settlement of high-speed railway subgrade, the impact of soil creep should be considered. In the creep calculation, the calculation parameters should have practical physical meaning. Therefore, based on the UH model considering time effect, the secondary development of ABAQUS software is realized, and the finite element simplified model of the high-speed railway in a section near Qufu East Station is established. The creep settlement of the points on the surface of the natural roadbed under the high-speed railway is concave curve of distribution. With the change of time, the creep growth rate of each point becomes slower and slower, and the creep settling curve shows a tendency of gradual flattening.","PeriodicalId":283909,"journal":{"name":"Japanese Geotechnical Society Special Publication","volume":"92 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Numerical simulation of creep settlement for high railway foundations based on the UH model considering time effect\",\"authors\":\"Wei Chen, Naidong Wang, Hongye Yan, Feng Chen, Qian-li Zhang\",\"doi\":\"10.3208/jgssp.v08.c02\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The high-speed railway has strict restrictions on the settlement of the roadbed, and the settlement value must not exceed 15mm. In the process of calculating the settlement of high-speed railway subgrade, the impact of soil creep should be considered. In the creep calculation, the calculation parameters should have practical physical meaning. Therefore, based on the UH model considering time effect, the secondary development of ABAQUS software is realized, and the finite element simplified model of the high-speed railway in a section near Qufu East Station is established. The creep settlement of the points on the surface of the natural roadbed under the high-speed railway is concave curve of distribution. With the change of time, the creep growth rate of each point becomes slower and slower, and the creep settling curve shows a tendency of gradual flattening.\",\"PeriodicalId\":283909,\"journal\":{\"name\":\"Japanese Geotechnical Society Special Publication\",\"volume\":\"92 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Japanese Geotechnical Society Special Publication\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3208/jgssp.v08.c02\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Japanese Geotechnical Society Special Publication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3208/jgssp.v08.c02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

高速铁路对路基沉降有严格的限制,沉降值不得超过15mm。在高速铁路路基沉降计算过程中,应考虑土体蠕变的影响。在蠕变计算中,计算参数应具有实际的物理意义。因此,在考虑时间效应的UH模型基础上,实现ABAQUS软件的二次开发,建立了曲阜东站附近某段高速铁路有限元简化模型。高速铁路下天然路基表面各点的蠕变沉降呈凹形分布曲线。随着时间的变化,各点蠕变增长速度越来越慢,蠕变沉降曲线呈现逐渐变平缓的趋势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Numerical simulation of creep settlement for high railway foundations based on the UH model considering time effect
The high-speed railway has strict restrictions on the settlement of the roadbed, and the settlement value must not exceed 15mm. In the process of calculating the settlement of high-speed railway subgrade, the impact of soil creep should be considered. In the creep calculation, the calculation parameters should have practical physical meaning. Therefore, based on the UH model considering time effect, the secondary development of ABAQUS software is realized, and the finite element simplified model of the high-speed railway in a section near Qufu East Station is established. The creep settlement of the points on the surface of the natural roadbed under the high-speed railway is concave curve of distribution. With the change of time, the creep growth rate of each point becomes slower and slower, and the creep settling curve shows a tendency of gradual flattening.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信