{"title":"马郎输电系统提高电压质量的多种联络线配置方案","authors":"M. N. Chanif, P. Widodo, Y. Rahmawati, I. Fadlika, A. Apriyanto, A. Afandi","doi":"10.1109/ICEEI47359.2019.8988824","DOIUrl":null,"url":null,"abstract":"This study presents additional network planning using the tie-line method and the effect of improving bus voltage profiles on transmission systems taking into account the increased load during peak loads. The transmission system used is a transmission system in area Malang, with a transmission voltage is 150 kV — 70 kV. Malang transmission system has a semi-radial-type network, with load centered on a substation in the town area. Large load and critical voltage drop occur in bus KA and bus SKL included in area Malang, the voltage drop up to 6% of the base voltage. In this study, the author focus on the effect of adding a tie-line to the Malang transmission system for improving the voltage profile. To select the appropriate network addition, using methods based on areas that have a large load and a large voltage drop. The method used for this problem is Z bus, with Kron Reduction to reduce the Z bus value after the addition of the tie-line network. The addition of the tie-line network has an effect of the improvement voltage in Malang transmission system, also improves the stability of the voltage on each bus substation in Malang area. With the addition of the Tie-line, the benefits obtained are the decreasing of power losses that occur in the system, the voltage of each bus remains stable despite the addition of load power and the constant supply of the generator.","PeriodicalId":236517,"journal":{"name":"2019 International Conference on Electrical Engineering and Informatics (ICEEI)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Multiple Tie-Line Configuration Scenarios for Voltage Quality Improvement in Malang Transmission System\",\"authors\":\"M. N. Chanif, P. Widodo, Y. Rahmawati, I. Fadlika, A. Apriyanto, A. Afandi\",\"doi\":\"10.1109/ICEEI47359.2019.8988824\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study presents additional network planning using the tie-line method and the effect of improving bus voltage profiles on transmission systems taking into account the increased load during peak loads. The transmission system used is a transmission system in area Malang, with a transmission voltage is 150 kV — 70 kV. Malang transmission system has a semi-radial-type network, with load centered on a substation in the town area. Large load and critical voltage drop occur in bus KA and bus SKL included in area Malang, the voltage drop up to 6% of the base voltage. In this study, the author focus on the effect of adding a tie-line to the Malang transmission system for improving the voltage profile. To select the appropriate network addition, using methods based on areas that have a large load and a large voltage drop. The method used for this problem is Z bus, with Kron Reduction to reduce the Z bus value after the addition of the tie-line network. The addition of the tie-line network has an effect of the improvement voltage in Malang transmission system, also improves the stability of the voltage on each bus substation in Malang area. With the addition of the Tie-line, the benefits obtained are the decreasing of power losses that occur in the system, the voltage of each bus remains stable despite the addition of load power and the constant supply of the generator.\",\"PeriodicalId\":236517,\"journal\":{\"name\":\"2019 International Conference on Electrical Engineering and Informatics (ICEEI)\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 International Conference on Electrical Engineering and Informatics (ICEEI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEEI47359.2019.8988824\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Electrical Engineering and Informatics (ICEEI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEEI47359.2019.8988824","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究提出了使用联络线方法的额外网络规划,以及考虑到高峰负荷期间增加的负荷,改善母线电压分布对输电系统的影响。采用的输电系统为玛琅地区的输电系统,输电电压为150kv - 70kv。麻郎输电系统为半辐射式网络,负荷集中在镇区变电站。马郎地区KA和SKL母线出现较大负载和临界电压降,电压降可达基极电压的6%。本文研究了在马郎输电系统中增加联络线对改善电压分布的影响。根据负荷大、电压降大的区域选择合适的网络添加。该问题采用的方法为Z母线,在加入联络线网络后,用Kron Reduction减小Z母线值。联络线网络的加入对马郎输电系统电压的改善起到了作用,也提高了马郎地区各母线槽电压的稳定性。随着联络线的增加,所获得的好处是减少了系统中发生的功率损耗,在增加负载功率和发电机不断供电的情况下,各母线的电压保持稳定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Multiple Tie-Line Configuration Scenarios for Voltage Quality Improvement in Malang Transmission System
This study presents additional network planning using the tie-line method and the effect of improving bus voltage profiles on transmission systems taking into account the increased load during peak loads. The transmission system used is a transmission system in area Malang, with a transmission voltage is 150 kV — 70 kV. Malang transmission system has a semi-radial-type network, with load centered on a substation in the town area. Large load and critical voltage drop occur in bus KA and bus SKL included in area Malang, the voltage drop up to 6% of the base voltage. In this study, the author focus on the effect of adding a tie-line to the Malang transmission system for improving the voltage profile. To select the appropriate network addition, using methods based on areas that have a large load and a large voltage drop. The method used for this problem is Z bus, with Kron Reduction to reduce the Z bus value after the addition of the tie-line network. The addition of the tie-line network has an effect of the improvement voltage in Malang transmission system, also improves the stability of the voltage on each bus substation in Malang area. With the addition of the Tie-line, the benefits obtained are the decreasing of power losses that occur in the system, the voltage of each bus remains stable despite the addition of load power and the constant supply of the generator.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信