考虑纵向不连续开挖和衬砌顺序安装的深粘弹性汉堡岩衬砌圆形隧道解析解

Zhaofei Chu, Zhijun Wu, Quansheng Liu, Baoguo Liu, Jinglai Sun
{"title":"考虑纵向不连续开挖和衬砌顺序安装的深粘弹性汉堡岩衬砌圆形隧道解析解","authors":"Zhaofei Chu, Zhijun Wu, Quansheng Liu, Baoguo Liu, Jinglai Sun","doi":"10.1061/(ASCE)EM.1943-7889.0001912","DOIUrl":null,"url":null,"abstract":"AbstractTunneling stoppage often occurs during tunnel construction, especially in weak and rheological ground. The discontinuous excavation caused by the stoppage usually has a certain impact on th...","PeriodicalId":299892,"journal":{"name":"Journal of Engineering Mechanics-asce","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"48","resultStr":"{\"title\":\"Analytical Solution for Lined Circular Tunnels in Deep Viscoelastic Burgers Rock Considering the Longitudinal Discontinuous Excavation and Sequential Installation of Liners\",\"authors\":\"Zhaofei Chu, Zhijun Wu, Quansheng Liu, Baoguo Liu, Jinglai Sun\",\"doi\":\"10.1061/(ASCE)EM.1943-7889.0001912\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"AbstractTunneling stoppage often occurs during tunnel construction, especially in weak and rheological ground. The discontinuous excavation caused by the stoppage usually has a certain impact on th...\",\"PeriodicalId\":299892,\"journal\":{\"name\":\"Journal of Engineering Mechanics-asce\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"48\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Mechanics-asce\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/(ASCE)EM.1943-7889.0001912\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Mechanics-asce","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/(ASCE)EM.1943-7889.0001912","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 48

摘要

摘要在隧道施工过程中,特别是在软弱、易变的地基中,经常发生隧道停工。由于停采而引起的间断开挖通常会对工程性能产生一定的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analytical Solution for Lined Circular Tunnels in Deep Viscoelastic Burgers Rock Considering the Longitudinal Discontinuous Excavation and Sequential Installation of Liners
AbstractTunneling stoppage often occurs during tunnel construction, especially in weak and rheological ground. The discontinuous excavation caused by the stoppage usually has a certain impact on th...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信