{"title":"库宁安县建设工程密码坝管理分析","authors":"Dian Rosdiana, Saihul Anwar","doi":"10.33603/jgst.v1i1.1033","DOIUrl":null,"url":null,"abstract":"Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety. This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow. The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"88 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY\",\"authors\":\"Dian Rosdiana, Saihul Anwar\",\"doi\":\"10.33603/jgst.v1i1.1033\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety. This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow. The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.\",\"PeriodicalId\":419103,\"journal\":{\"name\":\"Journal of Green Science and Technology\",\"volume\":\"88 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Green Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/jgst.v1i1.1033\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v1i1.1033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY
Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety. This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow. The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.