{"title":"2013年和2019年KRG GRID网络不同年份的比较","authors":"Dana Bahram Khudhur, Z. Müller","doi":"10.1109/EPE51172.2020.9269166","DOIUrl":null,"url":null,"abstract":"The development of national electric power network infrastructure in the Kurdistan region of Iraq has shown substantial growth in the last decades. The goal of this paper is to show the difference in the electric power network between two different years, and how gradually the demand for energy consumption was increasing. The growth includes the generation, transmission lines, Substation, and load demand. Furthermore, it is good to present the expansion plans concerning the factors mentioned above.","PeriodicalId":177031,"journal":{"name":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The KRG GRID Network Comparison Between Two Different Years 2013 and 2019\",\"authors\":\"Dana Bahram Khudhur, Z. Müller\",\"doi\":\"10.1109/EPE51172.2020.9269166\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of national electric power network infrastructure in the Kurdistan region of Iraq has shown substantial growth in the last decades. The goal of this paper is to show the difference in the electric power network between two different years, and how gradually the demand for energy consumption was increasing. The growth includes the generation, transmission lines, Substation, and load demand. Furthermore, it is good to present the expansion plans concerning the factors mentioned above.\",\"PeriodicalId\":177031,\"journal\":{\"name\":\"2020 21st International Scientific Conference on Electric Power Engineering (EPE)\",\"volume\":\"59 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 21st International Scientific Conference on Electric Power Engineering (EPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPE51172.2020.9269166\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPE51172.2020.9269166","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The KRG GRID Network Comparison Between Two Different Years 2013 and 2019
The development of national electric power network infrastructure in the Kurdistan region of Iraq has shown substantial growth in the last decades. The goal of this paper is to show the difference in the electric power network between two different years, and how gradually the demand for energy consumption was increasing. The growth includes the generation, transmission lines, Substation, and load demand. Furthermore, it is good to present the expansion plans concerning the factors mentioned above.