集热器效率对印度200mw太阳能烟囱电厂平差电价的影响

Zainab Akhtar, K. S. Rao
{"title":"集热器效率对印度200mw太阳能烟囱电厂平差电价的影响","authors":"Zainab Akhtar, K. S. Rao","doi":"10.1109/ICTSD.2015.7095908","DOIUrl":null,"url":null,"abstract":"This paper presents an economic analysis of solar chimney power plant (SCPP) of 200 MW capacity in India by taking fifteen different sets of dimensions of chimney height and collector diameter, five sets each corresponding to collector efficiency of 33%, 50% and 65%. Quantity of different materials required and capital cost for construction of 200 MW solar chimney power plant is estimated. Based on capital cost, operation cost and maintenance cost, levelized electricity cost (LEC) for SCPP is calculated first for five sets corresponding to collector efficiency of 33% and calculations have been demonstrated. Calculations are repeated for collector efficiency values of 50% and 65%. Further, capital cost and LEC for different values of collector efficiency were compared.","PeriodicalId":270099,"journal":{"name":"2015 International Conference on Technologies for Sustainable Development (ICTSD)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2015-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Effect of collector efficiency on levelized electricity cost of 200 MW solar chimney power plant in India\",\"authors\":\"Zainab Akhtar, K. S. Rao\",\"doi\":\"10.1109/ICTSD.2015.7095908\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an economic analysis of solar chimney power plant (SCPP) of 200 MW capacity in India by taking fifteen different sets of dimensions of chimney height and collector diameter, five sets each corresponding to collector efficiency of 33%, 50% and 65%. Quantity of different materials required and capital cost for construction of 200 MW solar chimney power plant is estimated. Based on capital cost, operation cost and maintenance cost, levelized electricity cost (LEC) for SCPP is calculated first for five sets corresponding to collector efficiency of 33% and calculations have been demonstrated. Calculations are repeated for collector efficiency values of 50% and 65%. Further, capital cost and LEC for different values of collector efficiency were compared.\",\"PeriodicalId\":270099,\"journal\":{\"name\":\"2015 International Conference on Technologies for Sustainable Development (ICTSD)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-04-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Technologies for Sustainable Development (ICTSD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICTSD.2015.7095908\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Technologies for Sustainable Development (ICTSD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICTSD.2015.7095908","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文对印度200mw容量的太阳能烟囱电厂(SCPP)进行了经济分析,选取了15套不同尺寸的烟囱高度和集热器直径,5套分别对应33%、50%和65%的集热器效率。估算了建设200兆瓦太阳能烟囱电厂所需的不同材料数量和资金成本。在综合考虑资金成本、运行成本和维护成本的基础上,首先计算了集热器效率为33%的5台机组SCPP的平净电力成本(LEC),并对计算结果进行了论证。在集热器效率值为50%和65%时重复计算。此外,还比较了不同集热器效率值下的资金成本和LEC。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Effect of collector efficiency on levelized electricity cost of 200 MW solar chimney power plant in India
This paper presents an economic analysis of solar chimney power plant (SCPP) of 200 MW capacity in India by taking fifteen different sets of dimensions of chimney height and collector diameter, five sets each corresponding to collector efficiency of 33%, 50% and 65%. Quantity of different materials required and capital cost for construction of 200 MW solar chimney power plant is estimated. Based on capital cost, operation cost and maintenance cost, levelized electricity cost (LEC) for SCPP is calculated first for five sets corresponding to collector efficiency of 33% and calculations have been demonstrated. Calculations are repeated for collector efficiency values of 50% and 65%. Further, capital cost and LEC for different values of collector efficiency were compared.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信