在仿真的基础上,提出了底火点火器制造过程的管理原理

E. N. Grigoryuk, V. Bulkin
{"title":"在仿真的基础上,提出了底火点火器制造过程的管理原理","authors":"E. N. Grigoryuk, V. Bulkin","doi":"10.1109/MEACS.2015.7414859","DOIUrl":null,"url":null,"abstract":"The present article is devoted to a brief description of technological process of manufacturing of primer-igniter of the type “BOXER”, the development of simulation models using MatLab Simulink, development of control algorithms for the process of manufacturing products. A version control system.","PeriodicalId":423038,"journal":{"name":"2015 International Conference on Mechanical Engineering, Automation and Control Systems (MEACS)","volume":"142 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Principles of management manufacturing process of the primer-igniter on the basis of simulation\",\"authors\":\"E. N. Grigoryuk, V. Bulkin\",\"doi\":\"10.1109/MEACS.2015.7414859\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The present article is devoted to a brief description of technological process of manufacturing of primer-igniter of the type “BOXER”, the development of simulation models using MatLab Simulink, development of control algorithms for the process of manufacturing products. A version control system.\",\"PeriodicalId\":423038,\"journal\":{\"name\":\"2015 International Conference on Mechanical Engineering, Automation and Control Systems (MEACS)\",\"volume\":\"142 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Mechanical Engineering, Automation and Control Systems (MEACS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MEACS.2015.7414859\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Mechanical Engineering, Automation and Control Systems (MEACS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MEACS.2015.7414859","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文简要介绍了BOXER型起爆点火器的制造工艺过程,利用MatLab Simulink建立了仿真模型,开发了产品制造过程的控制算法。一个版本控制系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Principles of management manufacturing process of the primer-igniter on the basis of simulation
The present article is devoted to a brief description of technological process of manufacturing of primer-igniter of the type “BOXER”, the development of simulation models using MatLab Simulink, development of control algorithms for the process of manufacturing products. A version control system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信