{"title":"三层多隶属度多层数据分析中模型错配对参数估计和模型拟合指标的影响:蒙特卡罗模拟研究","authors":"Hyewon Chung","doi":"10.31158/jeev.2018.31.3.799","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":207460,"journal":{"name":"Korean Society for Educational Evaluation","volume":"167 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Impact of Model Mis-specifications on the Parameter Estimates and Model Fit Indices in the Analysis of 3-level Multiple Membership Multilevel Data: A Monte Carlo Simulation Study\",\"authors\":\"Hyewon Chung\",\"doi\":\"10.31158/jeev.2018.31.3.799\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":207460,\"journal\":{\"name\":\"Korean Society for Educational Evaluation\",\"volume\":\"167 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korean Society for Educational Evaluation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31158/jeev.2018.31.3.799\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Society for Educational Evaluation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31158/jeev.2018.31.3.799","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Impact of Model Mis-specifications on the Parameter Estimates and Model Fit Indices in the Analysis of 3-level Multiple Membership Multilevel Data: A Monte Carlo Simulation Study