热力和原料磨改造达到2200 STPD

G. McKervey, S. W. Miller, Jared B. Weston
{"title":"热力和原料磨改造达到2200 STPD","authors":"G. McKervey, S. W. Miller, Jared B. Weston","doi":"10.1109/CITCON.2014.6820118","DOIUrl":null,"url":null,"abstract":"The Company was left with more finish grinding capacity than the 4-stage preheater kiln could supply, emission credits set to expire in 2011 and one of the healthier cement markets in the USA after shutting down a wet kiln in 2006. A strong, successful and healthy relationship with the original equipment supplier (OEM) has allowed the Company to implement new technologies to drive the operation of the equipment throughout the 30 year history of the production line. Recently, the Company chose the OEM in undertaking a number of upgrades to achieve an increase in capacity and improved efficiency. This paper highlights the steps taken during a 2-phase upgrade to achieve 2,200 STPD (2,000 MTPD) of clinker and allow the Company to remain at the forefront in implementing new technologies in the industry.","PeriodicalId":422446,"journal":{"name":"2014 IEEE-IAS/PCA Cement Industry Technical Conference","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Pyro and raw mill modifications to achieve 2,200 STPD\",\"authors\":\"G. McKervey, S. W. Miller, Jared B. Weston\",\"doi\":\"10.1109/CITCON.2014.6820118\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Company was left with more finish grinding capacity than the 4-stage preheater kiln could supply, emission credits set to expire in 2011 and one of the healthier cement markets in the USA after shutting down a wet kiln in 2006. A strong, successful and healthy relationship with the original equipment supplier (OEM) has allowed the Company to implement new technologies to drive the operation of the equipment throughout the 30 year history of the production line. Recently, the Company chose the OEM in undertaking a number of upgrades to achieve an increase in capacity and improved efficiency. This paper highlights the steps taken during a 2-phase upgrade to achieve 2,200 STPD (2,000 MTPD) of clinker and allow the Company to remain at the forefront in implementing new technologies in the industry.\",\"PeriodicalId\":422446,\"journal\":{\"name\":\"2014 IEEE-IAS/PCA Cement Industry Technical Conference\",\"volume\":\"72 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-04-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE-IAS/PCA Cement Industry Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CITCON.2014.6820118\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE-IAS/PCA Cement Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.2014.6820118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

该公司剩下的成品磨产能超过了四段预热窑的供应能力,排放信用额度将于2011年到期,并且在2006年关闭湿式窑后成为美国较为健康的水泥市场之一。与原始设备供应商(OEM)建立了牢固,成功和健康的关系,使公司能够在整个30年的生产线历史中实施新技术来驱动设备的运行。最近,公司选择OEM进行一些升级,以实现产能的增加和效率的提高。本文重点介绍了在两个阶段的升级过程中所采取的步骤,以达到2200 STPD (2000 MTPD)的熟料,并使公司在实施新技术方面保持领先地位。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pyro and raw mill modifications to achieve 2,200 STPD
The Company was left with more finish grinding capacity than the 4-stage preheater kiln could supply, emission credits set to expire in 2011 and one of the healthier cement markets in the USA after shutting down a wet kiln in 2006. A strong, successful and healthy relationship with the original equipment supplier (OEM) has allowed the Company to implement new technologies to drive the operation of the equipment throughout the 30 year history of the production line. Recently, the Company chose the OEM in undertaking a number of upgrades to achieve an increase in capacity and improved efficiency. This paper highlights the steps taken during a 2-phase upgrade to achieve 2,200 STPD (2,000 MTPD) of clinker and allow the Company to remain at the forefront in implementing new technologies in the industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信