A. Venturi, P. Clarkson, A. Forbes, E. Davidson, A. Roscoe, G. Burt, Xin-She Yang, P. Wright
{"title":"智能电网中精确测量的作用","authors":"A. Venturi, P. Clarkson, A. Forbes, E. Davidson, A. Roscoe, G. Burt, Xin-She Yang, P. Wright","doi":"10.1109/ISGTEurope.2011.6162796","DOIUrl":null,"url":null,"abstract":"The necessity of developing alternatives to fossil combustibles as energy sources is increasingly leading towards non-conventional, renewable and distributed generation systems. To manage the transition from the present centralized grid to the future active systems consisting of multiple bi-directional energy clients it is necessary to extend the measurement systems to LV grids. The overall objective of this work is to install real-time measuring devices at a few grid locations, and use distribution state estimation techniques to implement active network management techniques on an experimental 100-kVA micro-grid.","PeriodicalId":419250,"journal":{"name":"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"The role of accurate measurements within smartgrids\",\"authors\":\"A. Venturi, P. Clarkson, A. Forbes, E. Davidson, A. Roscoe, G. Burt, Xin-She Yang, P. Wright\",\"doi\":\"10.1109/ISGTEurope.2011.6162796\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The necessity of developing alternatives to fossil combustibles as energy sources is increasingly leading towards non-conventional, renewable and distributed generation systems. To manage the transition from the present centralized grid to the future active systems consisting of multiple bi-directional energy clients it is necessary to extend the measurement systems to LV grids. The overall objective of this work is to install real-time measuring devices at a few grid locations, and use distribution state estimation techniques to implement active network management techniques on an experimental 100-kVA micro-grid.\",\"PeriodicalId\":419250,\"journal\":{\"name\":\"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEurope.2011.6162796\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEurope.2011.6162796","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The role of accurate measurements within smartgrids
The necessity of developing alternatives to fossil combustibles as energy sources is increasingly leading towards non-conventional, renewable and distributed generation systems. To manage the transition from the present centralized grid to the future active systems consisting of multiple bi-directional energy clients it is necessary to extend the measurement systems to LV grids. The overall objective of this work is to install real-time measuring devices at a few grid locations, and use distribution state estimation techniques to implement active network management techniques on an experimental 100-kVA micro-grid.