{"title":"传统电厂电网规范故障穿越要求分析","authors":"Orlando I. Martínez-Paredes, T. Asiaín-Olivares, D. Ruiz-Vega","doi":"10.1109/ROPEC50909.2020.9258751","DOIUrl":null,"url":null,"abstract":"This paper presents an analysis of the fault ride-through requirements established in grid codes around the world, that conventional power plants should comply, in order to be able to be connected to the transmission network. It describes the causes of this requirement, the way it is currently applied in most electric utilities, and the effect that power plant auxiliaries have in the assessment of this important characteristic. It was found that auxiliaries have a very important effect in the fault ride-through capability of the power plant, and should therefore be explicitly represented in those cases. In addition, it was observed that, in the way this requirement is currently verified, it can be contradictory to stability criteria, and this requires improving the methods of verifying the fault ride-through capability of the plant, so as to conciliate this aspect with stability criteria.","PeriodicalId":177447,"journal":{"name":"2020 IEEE International Autumn Meeting on Power, Electronics and Computing (ROPEC)","volume":"19 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of the Grid Code Fault Ride-Through Requirements for Conventional Power Plants\",\"authors\":\"Orlando I. Martínez-Paredes, T. Asiaín-Olivares, D. Ruiz-Vega\",\"doi\":\"10.1109/ROPEC50909.2020.9258751\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an analysis of the fault ride-through requirements established in grid codes around the world, that conventional power plants should comply, in order to be able to be connected to the transmission network. It describes the causes of this requirement, the way it is currently applied in most electric utilities, and the effect that power plant auxiliaries have in the assessment of this important characteristic. It was found that auxiliaries have a very important effect in the fault ride-through capability of the power plant, and should therefore be explicitly represented in those cases. In addition, it was observed that, in the way this requirement is currently verified, it can be contradictory to stability criteria, and this requires improving the methods of verifying the fault ride-through capability of the plant, so as to conciliate this aspect with stability criteria.\",\"PeriodicalId\":177447,\"journal\":{\"name\":\"2020 IEEE International Autumn Meeting on Power, Electronics and Computing (ROPEC)\",\"volume\":\"19 2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE International Autumn Meeting on Power, Electronics and Computing (ROPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ROPEC50909.2020.9258751\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Autumn Meeting on Power, Electronics and Computing (ROPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ROPEC50909.2020.9258751","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文分析了世界各国电网规范中规定的常规电厂要接入输电网必须满足的故障穿越要求。它描述了这一要求的原因,目前在大多数电力设施中应用的方式,以及发电厂辅助设备在评估这一重要特性方面的作用。研究发现,辅机对电厂的故障通过能力有非常重要的影响,因此在这些情况下应明确表示。此外,据观察,在目前验证这一要求的方式中,它可能与稳定性标准相矛盾,这需要改进验证工厂故障穿越能力的方法,以便将这方面与稳定性标准相协调。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of the Grid Code Fault Ride-Through Requirements for Conventional Power Plants
This paper presents an analysis of the fault ride-through requirements established in grid codes around the world, that conventional power plants should comply, in order to be able to be connected to the transmission network. It describes the causes of this requirement, the way it is currently applied in most electric utilities, and the effect that power plant auxiliaries have in the assessment of this important characteristic. It was found that auxiliaries have a very important effect in the fault ride-through capability of the power plant, and should therefore be explicitly represented in those cases. In addition, it was observed that, in the way this requirement is currently verified, it can be contradictory to stability criteria, and this requires improving the methods of verifying the fault ride-through capability of the plant, so as to conciliate this aspect with stability criteria.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信