A. Maish, C. Atcitty, S. Hester, D. Greenberg, D. Osborn, D. Collier, M. Brine
{"title":"光伏系统可靠性","authors":"A. Maish, C. Atcitty, S. Hester, D. Greenberg, D. Osborn, D. Collier, M. Brine","doi":"10.1109/PVSC.1997.654269","DOIUrl":null,"url":null,"abstract":"This paper discusses the reliability of photovoltaic projects including SMUD's PV Pioneer project, various projects monitored by Ascension Technology, and the Colorado Parks project. System times-to-failure range from 1 to 16 years, and maintenance costs range from 1 to 16 cents per kilowatt-hour. Factors contributing to the reliability of these systems are discussed, and practices are recommended that can be applied to future projects. This paper also discusses the methodology used to collect and analyze PV system reliability data.","PeriodicalId":251166,"journal":{"name":"Conference Record of the Twenty Sixth IEEE Photovoltaic Specialists Conference - 1997","volume":"60 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"69","resultStr":"{\"title\":\"Photovoltaic system reliability\",\"authors\":\"A. Maish, C. Atcitty, S. Hester, D. Greenberg, D. Osborn, D. Collier, M. Brine\",\"doi\":\"10.1109/PVSC.1997.654269\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses the reliability of photovoltaic projects including SMUD's PV Pioneer project, various projects monitored by Ascension Technology, and the Colorado Parks project. System times-to-failure range from 1 to 16 years, and maintenance costs range from 1 to 16 cents per kilowatt-hour. Factors contributing to the reliability of these systems are discussed, and practices are recommended that can be applied to future projects. This paper also discusses the methodology used to collect and analyze PV system reliability data.\",\"PeriodicalId\":251166,\"journal\":{\"name\":\"Conference Record of the Twenty Sixth IEEE Photovoltaic Specialists Conference - 1997\",\"volume\":\"60 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"69\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record of the Twenty Sixth IEEE Photovoltaic Specialists Conference - 1997\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PVSC.1997.654269\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of the Twenty Sixth IEEE Photovoltaic Specialists Conference - 1997","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PVSC.1997.654269","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper discusses the reliability of photovoltaic projects including SMUD's PV Pioneer project, various projects monitored by Ascension Technology, and the Colorado Parks project. System times-to-failure range from 1 to 16 years, and maintenance costs range from 1 to 16 cents per kilowatt-hour. Factors contributing to the reliability of these systems are discussed, and practices are recommended that can be applied to future projects. This paper also discusses the methodology used to collect and analyze PV system reliability data.