{"title":"高压单变变电站实施的便利性和可能性","authors":"J. Survilo, Lubova Petriclienko","doi":"10.1109/RTUCON.2018.8659896","DOIUrl":null,"url":null,"abstract":"In a rural terrain, fragmented economically insignificant farms are becoming less. Big farms predominate over large distances with a considerable consumption of electricity. In towns and villages, the population decreases. At step down substations, two 110 kV transformers is an excess because one of them predominantly is idle. Although with a certain load duration curve, power losses in multi-transformer substation may be less, however, all the same, life cycle cost for multi-transformer substations is more. To provide sufficient for such local power supply reliability, sometimes it is possible reserving the MV secondary side of these transformers from neighboring networks of the same voltage. But for this it is necessary to increase the primary voltage of the distribution network from 20 kV to 33 kV, and among all consumers of the substation supply zone, to identify those who, without much harm, can endure without electricity a couple of hours but in the power system to keep the spare transformer on move. However the option of 33 kV can pay off only by total renovation of transformer’s park of some part or of entire power system.","PeriodicalId":192943,"journal":{"name":"2018 IEEE 59th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Expedience and Possibilities of Implementation of HV Single-transformer Substations\",\"authors\":\"J. Survilo, Lubova Petriclienko\",\"doi\":\"10.1109/RTUCON.2018.8659896\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a rural terrain, fragmented economically insignificant farms are becoming less. Big farms predominate over large distances with a considerable consumption of electricity. In towns and villages, the population decreases. At step down substations, two 110 kV transformers is an excess because one of them predominantly is idle. Although with a certain load duration curve, power losses in multi-transformer substation may be less, however, all the same, life cycle cost for multi-transformer substations is more. To provide sufficient for such local power supply reliability, sometimes it is possible reserving the MV secondary side of these transformers from neighboring networks of the same voltage. But for this it is necessary to increase the primary voltage of the distribution network from 20 kV to 33 kV, and among all consumers of the substation supply zone, to identify those who, without much harm, can endure without electricity a couple of hours but in the power system to keep the spare transformer on move. However the option of 33 kV can pay off only by total renovation of transformer’s park of some part or of entire power system.\",\"PeriodicalId\":192943,\"journal\":{\"name\":\"2018 IEEE 59th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE 59th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RTUCON.2018.8659896\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 59th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTUCON.2018.8659896","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在农村地区,分散的经济上不重要的农场越来越少。大型农场在远距离上占主导地位,耗电量相当大。在城镇和乡村,人口减少。在降压变电站,两个110千伏变压器是多余的,因为其中一个主要是闲置的。虽然在一定的负荷持续曲线下,多变电站的功率损耗可能较小,但同样多变电站的寿命周期成本更高。为了提供足够的本地供电可靠性,有时可以从相同电压的相邻网络中保留这些变压器的中压次侧。但为此,有必要将配电网的一次电压从20千伏提高到33千伏,并在变电站供电区的所有消费者中,找出那些在没有电力的情况下可以忍受几个小时但在电力系统中保持备用变压器运行的人,而不会受到太大伤害。然而,33kv的选择只能通过对部分或整个电力系统的变压器园区进行全面改造来获得回报。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Expedience and Possibilities of Implementation of HV Single-transformer Substations
In a rural terrain, fragmented economically insignificant farms are becoming less. Big farms predominate over large distances with a considerable consumption of electricity. In towns and villages, the population decreases. At step down substations, two 110 kV transformers is an excess because one of them predominantly is idle. Although with a certain load duration curve, power losses in multi-transformer substation may be less, however, all the same, life cycle cost for multi-transformer substations is more. To provide sufficient for such local power supply reliability, sometimes it is possible reserving the MV secondary side of these transformers from neighboring networks of the same voltage. But for this it is necessary to increase the primary voltage of the distribution network from 20 kV to 33 kV, and among all consumers of the substation supply zone, to identify those who, without much harm, can endure without electricity a couple of hours but in the power system to keep the spare transformer on move. However the option of 33 kV can pay off only by total renovation of transformer’s park of some part or of entire power system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信