城市变电所区域快速故障处理

Xiaolei Yang, Changxin Ge, Ning Zhang, Chang Zhao, Haihang Xu, Chuanzong Zhao
{"title":"城市变电所区域快速故障处理","authors":"Xiaolei Yang, Changxin Ge, Ning Zhang, Chang Zhao, Haihang Xu, Chuanzong Zhao","doi":"10.1109/ICPICS55264.2022.9873691","DOIUrl":null,"url":null,"abstract":"With the continuous improvement of urban construction level in China, the reliable operation of power distribution network has attracted more and more attention. However, in view of the high complaint rate caused by power failures, the problem of long power failure time in urban public transformation is found out. By investigating the outage time of public transformer in urban areas, we get the fact that the emergency repair time is long after the failure of public transformer in urban areas. In this paper, by sorting out the types of faults in the urban common transformer areas, the emergency repair time of each type of fault was queried and counted, and the reasons for the long emergency repair time of the common transformer areas were demonstrated and the long repair time of JP cabinet was deeply analyzed. It was determined that the reason for the long emergency repair time of JP cabinet switch fault was long. Through the research and development and experiment, anti-shedding hex socket and special screw fastening device were successfully made. After a lot of practical application, the time of emergency repair is greatly shortened, and the efficiency of emergency repair of failure and power failure in substation area is greatly improved, which has great value of popularization and application.","PeriodicalId":257180,"journal":{"name":"2022 IEEE 4th International Conference on Power, Intelligent Computing and Systems (ICPICS)","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Quick Troubleshooting of Urban Substation Area\",\"authors\":\"Xiaolei Yang, Changxin Ge, Ning Zhang, Chang Zhao, Haihang Xu, Chuanzong Zhao\",\"doi\":\"10.1109/ICPICS55264.2022.9873691\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the continuous improvement of urban construction level in China, the reliable operation of power distribution network has attracted more and more attention. However, in view of the high complaint rate caused by power failures, the problem of long power failure time in urban public transformation is found out. By investigating the outage time of public transformer in urban areas, we get the fact that the emergency repair time is long after the failure of public transformer in urban areas. In this paper, by sorting out the types of faults in the urban common transformer areas, the emergency repair time of each type of fault was queried and counted, and the reasons for the long emergency repair time of the common transformer areas were demonstrated and the long repair time of JP cabinet was deeply analyzed. It was determined that the reason for the long emergency repair time of JP cabinet switch fault was long. Through the research and development and experiment, anti-shedding hex socket and special screw fastening device were successfully made. After a lot of practical application, the time of emergency repair is greatly shortened, and the efficiency of emergency repair of failure and power failure in substation area is greatly improved, which has great value of popularization and application.\",\"PeriodicalId\":257180,\"journal\":{\"name\":\"2022 IEEE 4th International Conference on Power, Intelligent Computing and Systems (ICPICS)\",\"volume\":\"47 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE 4th International Conference on Power, Intelligent Computing and Systems (ICPICS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPICS55264.2022.9873691\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 4th International Conference on Power, Intelligent Computing and Systems (ICPICS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPICS55264.2022.9873691","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着中国城市建设水平的不断提高,配电网的可靠运行越来越受到人们的重视。然而,针对停电造成的高投诉率,发现了城市公共改造中停电时间过长的问题。通过对城市公共变压器停电时间的调查,得出了城市公共变压器故障后应急抢修时间较长的事实。本文通过对城市共变区域的故障类型进行梳理,查询并统计各类型故障的应急抢修时间,论证了共变区域应急抢修时间长的原因,并对JP柜的抢修时间长进行了深入分析。确定了JP柜开关故障应急抢修时间长的原因。通过研发和试验,成功研制了防脱落内六角套筒和专用螺丝紧固装置。经过大量的实际应用,大大缩短了应急抢修时间,大大提高了变电所区域故障和停电应急抢修的效率,具有很大的推广应用价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Quick Troubleshooting of Urban Substation Area
With the continuous improvement of urban construction level in China, the reliable operation of power distribution network has attracted more and more attention. However, in view of the high complaint rate caused by power failures, the problem of long power failure time in urban public transformation is found out. By investigating the outage time of public transformer in urban areas, we get the fact that the emergency repair time is long after the failure of public transformer in urban areas. In this paper, by sorting out the types of faults in the urban common transformer areas, the emergency repair time of each type of fault was queried and counted, and the reasons for the long emergency repair time of the common transformer areas were demonstrated and the long repair time of JP cabinet was deeply analyzed. It was determined that the reason for the long emergency repair time of JP cabinet switch fault was long. Through the research and development and experiment, anti-shedding hex socket and special screw fastening device were successfully made. After a lot of practical application, the time of emergency repair is greatly shortened, and the efficiency of emergency repair of failure and power failure in substation area is greatly improved, which has great value of popularization and application.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信