{"title":"委内瑞拉互联电力系统预期中期优化运行规划","authors":"A. Freitez, E. Alcala, J. Toledo, J. Jiménez","doi":"10.1109/TDCLA.2006.311594","DOIUrl":null,"url":null,"abstract":"The Venezuelan power system is composed by the generation and transmission recourses needed to supply the power demand all around the country. The power system is interconnected by means of a high voltage transmission network knew as the RTT. Highly dependent of hydro generation located in only one river, the optimal operational planning that guarantees demand supply at least cost and preserve the important hydro resource depends on weather conditions. These are important issues, more when electricity demand has experienced a high rate growth in the last years. This paper presents the simulation for the optimal dispatch of Venezuelan interconnected power system generation for the period 2006-2010","PeriodicalId":406067,"journal":{"name":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Expected Mid Term Optimal Operational Planning of the Venezuelan Interconnected Power System\",\"authors\":\"A. Freitez, E. Alcala, J. Toledo, J. Jiménez\",\"doi\":\"10.1109/TDCLA.2006.311594\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Venezuelan power system is composed by the generation and transmission recourses needed to supply the power demand all around the country. The power system is interconnected by means of a high voltage transmission network knew as the RTT. Highly dependent of hydro generation located in only one river, the optimal operational planning that guarantees demand supply at least cost and preserve the important hydro resource depends on weather conditions. These are important issues, more when electricity demand has experienced a high rate growth in the last years. This paper presents the simulation for the optimal dispatch of Venezuelan interconnected power system generation for the period 2006-2010\",\"PeriodicalId\":406067,\"journal\":{\"name\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLA.2006.311594\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLA.2006.311594","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Expected Mid Term Optimal Operational Planning of the Venezuelan Interconnected Power System
The Venezuelan power system is composed by the generation and transmission recourses needed to supply the power demand all around the country. The power system is interconnected by means of a high voltage transmission network knew as the RTT. Highly dependent of hydro generation located in only one river, the optimal operational planning that guarantees demand supply at least cost and preserve the important hydro resource depends on weather conditions. These are important issues, more when electricity demand has experienced a high rate growth in the last years. This paper presents the simulation for the optimal dispatch of Venezuelan interconnected power system generation for the period 2006-2010