{"title":"使用IEC 61850鹅消息实现电弧闪光保护","authors":"C. Cabrera, S. Chiu, N. Nair","doi":"10.1109/POWERCON.2012.6401467","DOIUrl":null,"url":null,"abstract":"Timely bus protection is extremely critical due to the widespread instability of the power system that can occur due to a bus fault. In addition to existing conventional ways of 11 kV bus protection a newer possibility of arc-flash protection using IEC 61850 generic object oriented substation event (GOOSE) messaging is now possible. Arc-flash protection has both high selectivity and security and relatively it costs less with other comparable schemes. This paper describes the design and implementation of Arc-Flash Protection using IEC 61850 based GOOSE messaging at a real substation in New Zealand. Further development and application of this form of 11kV bus protection happening in Powerco will also be discussed.","PeriodicalId":176214,"journal":{"name":"2012 IEEE International Conference on Power System Technology (POWERCON)","volume":"82 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Implementation of Arc-Flash Protection using IEC 61850 Goose messaging\",\"authors\":\"C. Cabrera, S. Chiu, N. Nair\",\"doi\":\"10.1109/POWERCON.2012.6401467\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Timely bus protection is extremely critical due to the widespread instability of the power system that can occur due to a bus fault. In addition to existing conventional ways of 11 kV bus protection a newer possibility of arc-flash protection using IEC 61850 generic object oriented substation event (GOOSE) messaging is now possible. Arc-flash protection has both high selectivity and security and relatively it costs less with other comparable schemes. This paper describes the design and implementation of Arc-Flash Protection using IEC 61850 based GOOSE messaging at a real substation in New Zealand. Further development and application of this form of 11kV bus protection happening in Powerco will also be discussed.\",\"PeriodicalId\":176214,\"journal\":{\"name\":\"2012 IEEE International Conference on Power System Technology (POWERCON)\",\"volume\":\"82 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE International Conference on Power System Technology (POWERCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERCON.2012.6401467\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE International Conference on Power System Technology (POWERCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERCON.2012.6401467","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Implementation of Arc-Flash Protection using IEC 61850 Goose messaging
Timely bus protection is extremely critical due to the widespread instability of the power system that can occur due to a bus fault. In addition to existing conventional ways of 11 kV bus protection a newer possibility of arc-flash protection using IEC 61850 generic object oriented substation event (GOOSE) messaging is now possible. Arc-flash protection has both high selectivity and security and relatively it costs less with other comparable schemes. This paper describes the design and implementation of Arc-Flash Protection using IEC 61850 based GOOSE messaging at a real substation in New Zealand. Further development and application of this form of 11kV bus protection happening in Powerco will also be discussed.