{"title":"一个解决CORV问题的程序","authors":"J. Bautista, M. Mateo, R. Companys, A. Corominas","doi":"10.1109/ISATP.1999.782985","DOIUrl":null,"url":null,"abstract":"Sequencing units on assembly lines in order to attenuate rate variations in resource consumption is a problem that has received growing attention in recent years. In this work, we deal with a particular case, the constrained output rate variation (CORV) problem, that seems to be better adapted than other views to real industry problems, especially in car production systems. After giving a general introduction and formulation, a procedure is described to obtain the searched sequence.","PeriodicalId":326575,"journal":{"name":"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A procedure to solve the CORV problem\",\"authors\":\"J. Bautista, M. Mateo, R. Companys, A. Corominas\",\"doi\":\"10.1109/ISATP.1999.782985\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Sequencing units on assembly lines in order to attenuate rate variations in resource consumption is a problem that has received growing attention in recent years. In this work, we deal with a particular case, the constrained output rate variation (CORV) problem, that seems to be better adapted than other views to real industry problems, especially in car production systems. After giving a general introduction and formulation, a procedure is described to obtain the searched sequence.\",\"PeriodicalId\":326575,\"journal\":{\"name\":\"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)\",\"volume\":\"57 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-07-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISATP.1999.782985\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISATP.1999.782985","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Sequencing units on assembly lines in order to attenuate rate variations in resource consumption is a problem that has received growing attention in recent years. In this work, we deal with a particular case, the constrained output rate variation (CORV) problem, that seems to be better adapted than other views to real industry problems, especially in car production systems. After giving a general introduction and formulation, a procedure is described to obtain the searched sequence.