M. Christoforidis, M. Aganagic, B. Awobamise, S. Tong, A. Rahimi
{"title":"基于内点法的水电系统中长期资源优化","authors":"M. Christoforidis, M. Aganagic, B. Awobamise, S. Tong, A. Rahimi","doi":"10.1109/PICA.1995.515180","DOIUrl":null,"url":null,"abstract":"This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance scheduling functions constitute the long-term/mid-term operational planning subsystem of Swiss Railways' new energy management system.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"54","resultStr":"{\"title\":\"Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method\",\"authors\":\"M. Christoforidis, M. Aganagic, B. Awobamise, S. Tong, A. Rahimi\",\"doi\":\"10.1109/PICA.1995.515180\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance scheduling functions constitute the long-term/mid-term operational planning subsystem of Swiss Railways' new energy management system.\",\"PeriodicalId\":294493,\"journal\":{\"name\":\"Proceedings of Power Industry Computer Applications Conference\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"54\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Power Industry Computer Applications Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICA.1995.515180\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Power Industry Computer Applications Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1995.515180","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method
This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance scheduling functions constitute the long-term/mid-term operational planning subsystem of Swiss Railways' new energy management system.