孟加拉国某往复式发动机发电厂的生命周期评估

M. Huq, Mahmudur Rahman, A. Islam, Md. Nurul Absar Chowdhury
{"title":"孟加拉国某往复式发动机发电厂的生命周期评估","authors":"M. Huq, Mahmudur Rahman, A. Islam, Md. Nurul Absar Chowdhury","doi":"10.1063/1.5115937","DOIUrl":null,"url":null,"abstract":"In view of the severe power crisis in Bangladesh, the government decided to use the quick rental power plants (QRPPs) as its important strategic technique to reduce power shortage in the shortest possible time. Under this strategy, several QRPPs were commissioned with a total capacity of more than 1000 MW. All the quick rental power plants are based on reciprocating engines. About 35.52 % of total generation capacity around 17,043 MW comes from reciprocating engine power plant. The goal of this paper is to perform a life cycle analysis of a 10.2 MW natural gas fired reciprocating engine (RE) power plant, which is being operated to supply electric power to a cement factory, Seven Circle Cement Company at Ghorasal, Narsingdi. The study reveals that the direct combustion of natural gas during the operational phase consumes maximum energy at 91.36% and the contribution of hidden processes is about 9%. Out of this 9%, the production of materials, manufacturing of equipmentand transportation is 0.50%, plant operation and maintenance 0.22%, and fuel cycle 7.91% of the total life cycle energy inputs. However, the energy consumption in decommissioning phases is negligible. This study also reveals that the major GHG emission is accounted for direct combustion of the fuel during operation of the power plant. The total GHG emissions from the 10.2 MW Reciprocating Engine (RE) power plant was estimated to be 672.22 g-CO2eq/kWh with the lifecycle efficiency of 34.21% and plant fuel efficiency of 37.45%.","PeriodicalId":423885,"journal":{"name":"8TH BSME INTERNATIONAL CONFERENCE ON THERMAL ENGINEERING","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Life cycle assessment of a reciprocating engine power plant in Bangladesh\",\"authors\":\"M. Huq, Mahmudur Rahman, A. Islam, Md. Nurul Absar Chowdhury\",\"doi\":\"10.1063/1.5115937\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In view of the severe power crisis in Bangladesh, the government decided to use the quick rental power plants (QRPPs) as its important strategic technique to reduce power shortage in the shortest possible time. Under this strategy, several QRPPs were commissioned with a total capacity of more than 1000 MW. All the quick rental power plants are based on reciprocating engines. About 35.52 % of total generation capacity around 17,043 MW comes from reciprocating engine power plant. The goal of this paper is to perform a life cycle analysis of a 10.2 MW natural gas fired reciprocating engine (RE) power plant, which is being operated to supply electric power to a cement factory, Seven Circle Cement Company at Ghorasal, Narsingdi. The study reveals that the direct combustion of natural gas during the operational phase consumes maximum energy at 91.36% and the contribution of hidden processes is about 9%. Out of this 9%, the production of materials, manufacturing of equipmentand transportation is 0.50%, plant operation and maintenance 0.22%, and fuel cycle 7.91% of the total life cycle energy inputs. However, the energy consumption in decommissioning phases is negligible. This study also reveals that the major GHG emission is accounted for direct combustion of the fuel during operation of the power plant. The total GHG emissions from the 10.2 MW Reciprocating Engine (RE) power plant was estimated to be 672.22 g-CO2eq/kWh with the lifecycle efficiency of 34.21% and plant fuel efficiency of 37.45%.\",\"PeriodicalId\":423885,\"journal\":{\"name\":\"8TH BSME INTERNATIONAL CONFERENCE ON THERMAL ENGINEERING\",\"volume\":\"54 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"8TH BSME INTERNATIONAL CONFERENCE ON THERMAL ENGINEERING\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1063/1.5115937\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"8TH BSME INTERNATIONAL CONFERENCE ON THERMAL ENGINEERING","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5115937","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

鉴于孟加拉国严重的电力危机,政府决定将快速租赁电厂(QRPPs)作为其重要的战略技术,以在最短的时间内减少电力短缺。在这一战略下,几个总容量超过1000兆瓦的qrpp投入使用。所有的快速租赁发电厂都是基于往复式发动机。往复发动机发电厂的发电量约占总发电量的35.52%,约为17043兆瓦。本文的目标是对10.2 MW天然气往复式发动机(RE)发电厂进行生命周期分析,该发电厂正在运行,为位于Narsingdi Ghorasal的水泥厂Seven Circle cement Company提供电力。研究表明,运行阶段天然气直接燃烧能耗最大,为91.36%,隐藏过程贡献约9%。在这9%的能源投入中,材料的生产、设备的制造和运输占0.50%,工厂的运行和维护占0.22%,燃料循环占7.91%。然而,退役阶段的能源消耗可以忽略不计。该研究还表明,主要的温室气体排放是在电厂运行过程中燃料的直接燃烧。10.2 MW往复式发动机(RE)电厂的总温室气体排放量估计为672.22 g-CO2eq/kWh,生命周期效率为34.21%,工厂燃油效率为37.45%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Life cycle assessment of a reciprocating engine power plant in Bangladesh
In view of the severe power crisis in Bangladesh, the government decided to use the quick rental power plants (QRPPs) as its important strategic technique to reduce power shortage in the shortest possible time. Under this strategy, several QRPPs were commissioned with a total capacity of more than 1000 MW. All the quick rental power plants are based on reciprocating engines. About 35.52 % of total generation capacity around 17,043 MW comes from reciprocating engine power plant. The goal of this paper is to perform a life cycle analysis of a 10.2 MW natural gas fired reciprocating engine (RE) power plant, which is being operated to supply electric power to a cement factory, Seven Circle Cement Company at Ghorasal, Narsingdi. The study reveals that the direct combustion of natural gas during the operational phase consumes maximum energy at 91.36% and the contribution of hidden processes is about 9%. Out of this 9%, the production of materials, manufacturing of equipmentand transportation is 0.50%, plant operation and maintenance 0.22%, and fuel cycle 7.91% of the total life cycle energy inputs. However, the energy consumption in decommissioning phases is negligible. This study also reveals that the major GHG emission is accounted for direct combustion of the fuel during operation of the power plant. The total GHG emissions from the 10.2 MW Reciprocating Engine (RE) power plant was estimated to be 672.22 g-CO2eq/kWh with the lifecycle efficiency of 34.21% and plant fuel efficiency of 37.45%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信