{"title":"跨加拿大电网的挑战与机遇","authors":"A. Kalantari, F. Galiana","doi":"10.1109/EEM.2012.6254726","DOIUrl":null,"url":null,"abstract":"The paper reports on the potential challenges and opportunities of an electric power trans-Canadian grid (TCG). The report, which is the first stage of a broad research project on the TCG, identifies and examines the main issues from a qualitative view point and sets the stage for further quantitative analysis. The paper evaluates the competitive advantage of a TCG to meet established planning and operation norms such as cost and reliability as well as more topical criteria related to emissions control as a result of concerns over climate change. The proposed TCG would interconnect the provincial grids more tightly through one or a combination of possible topologies elaborated upon in the paper. The possible advantages of such a project are discussed in detail as are the expected barriers.","PeriodicalId":383754,"journal":{"name":"2012 9th International Conference on the European Energy Market","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Challenges and opportunities of a trans-canadian grid\",\"authors\":\"A. Kalantari, F. Galiana\",\"doi\":\"10.1109/EEM.2012.6254726\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper reports on the potential challenges and opportunities of an electric power trans-Canadian grid (TCG). The report, which is the first stage of a broad research project on the TCG, identifies and examines the main issues from a qualitative view point and sets the stage for further quantitative analysis. The paper evaluates the competitive advantage of a TCG to meet established planning and operation norms such as cost and reliability as well as more topical criteria related to emissions control as a result of concerns over climate change. The proposed TCG would interconnect the provincial grids more tightly through one or a combination of possible topologies elaborated upon in the paper. The possible advantages of such a project are discussed in detail as are the expected barriers.\",\"PeriodicalId\":383754,\"journal\":{\"name\":\"2012 9th International Conference on the European Energy Market\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 9th International Conference on the European Energy Market\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2012.6254726\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 9th International Conference on the European Energy Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2012.6254726","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Challenges and opportunities of a trans-canadian grid
The paper reports on the potential challenges and opportunities of an electric power trans-Canadian grid (TCG). The report, which is the first stage of a broad research project on the TCG, identifies and examines the main issues from a qualitative view point and sets the stage for further quantitative analysis. The paper evaluates the competitive advantage of a TCG to meet established planning and operation norms such as cost and reliability as well as more topical criteria related to emissions control as a result of concerns over climate change. The proposed TCG would interconnect the provincial grids more tightly through one or a combination of possible topologies elaborated upon in the paper. The possible advantages of such a project are discussed in detail as are the expected barriers.