Aryo De Wibowo Muhammad Sidik, Deri Ramdani, Dodi Sopandita, Asep Zam Zam Fadilah, Efendi Efendi
{"title":"印尼丹戎霹雳港集装箱停留时间建模与优化","authors":"Aryo De Wibowo Muhammad Sidik, Deri Ramdani, Dodi Sopandita, Asep Zam Zam Fadilah, Efendi Efendi","doi":"10.1109/ICCED51276.2020.9415805","DOIUrl":null,"url":null,"abstract":"Import containers stay too long, around 6.2 days at container terminals in Indonesia, which is negatively affecting logistics cost and is causing a serious adverse effect in terms of logistic costs for domestic businesses and prices paid by consumers. In this paper, we propose a method which controls and reduces dwell-time of import containers in The Port of Tanjung Perak. The controlled object is modeled as a reengineering business proses of import containers which controls time duration, processes and weights. Experimental results demonstrate the optimization of the proposed method and reduce the dwell-time.","PeriodicalId":344981,"journal":{"name":"2020 6th International Conference on Computing Engineering and Design (ICCED)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Modelling and Optimization Containers Dwell-Time in Tanjung Perak Port Indonesia\",\"authors\":\"Aryo De Wibowo Muhammad Sidik, Deri Ramdani, Dodi Sopandita, Asep Zam Zam Fadilah, Efendi Efendi\",\"doi\":\"10.1109/ICCED51276.2020.9415805\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Import containers stay too long, around 6.2 days at container terminals in Indonesia, which is negatively affecting logistics cost and is causing a serious adverse effect in terms of logistic costs for domestic businesses and prices paid by consumers. In this paper, we propose a method which controls and reduces dwell-time of import containers in The Port of Tanjung Perak. The controlled object is modeled as a reengineering business proses of import containers which controls time duration, processes and weights. Experimental results demonstrate the optimization of the proposed method and reduce the dwell-time.\",\"PeriodicalId\":344981,\"journal\":{\"name\":\"2020 6th International Conference on Computing Engineering and Design (ICCED)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 6th International Conference on Computing Engineering and Design (ICCED)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCED51276.2020.9415805\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 6th International Conference on Computing Engineering and Design (ICCED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCED51276.2020.9415805","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modelling and Optimization Containers Dwell-Time in Tanjung Perak Port Indonesia
Import containers stay too long, around 6.2 days at container terminals in Indonesia, which is negatively affecting logistics cost and is causing a serious adverse effect in terms of logistic costs for domestic businesses and prices paid by consumers. In this paper, we propose a method which controls and reduces dwell-time of import containers in The Port of Tanjung Perak. The controlled object is modeled as a reengineering business proses of import containers which controls time duration, processes and weights. Experimental results demonstrate the optimization of the proposed method and reduce the dwell-time.