{"title":"一种创新的非胶结下部完井井眼清洁解决方案为ADNOC节省了2700万美元的陆上成本","authors":"E. Varma, P. Mwansa, M. Husien, Abdul Raman Bin Bahrom, Raymond Saragi, Ali Sulaiman Ahmed BinSumaida, Musabbeh Khamis Al Samahi, El Walid Ben Mohamed El Moumni, Juma Sulaiman Al Shamsi, Ahmad Othman Alshaigy, Anchit Gaurav, Khaled Abdelhalim","doi":"10.2118/211548-ms","DOIUrl":null,"url":null,"abstract":"\n The long-term development of any mature field requires a fresh perspective of long MRC (Maximum reservoir contact) wells and increased well accessibility. To improve well accessibility the deployment of lower completion has been a mandate. Onshore UAE Field demands drilling Slim hole (6″ /6-1/8″ ) laterals and Slim Hole ERD (Extended reach drilling) wells with 4.5″ Uncemented Lower Completion. This paper highlights the innovative wellbore cleanout procedure prior installation of Lower Completions.\n Conventionally, using Water Based Mud (WBM) with high friction factors in 6″ Horizontal Hole (HH), two trips were required to reduce the friction factor prior running the Lower Completion. The optimized solution allowed wellbore clean-up and displacement of brine in one trip with drilling assembly (BHA). This innovative technique eliminated one dedicated trip for wellbore cleanout and thus saved millions in CAPEX and Business Plan days.\n The T&D data for 5 wells with dedicated cleanout trip were compared to clean-out with 6″ drilling BHA with viscous-lubricated brine. The 6″ BHA was optimized to fit with innovative dormant drilling scrapper and lubricated viscous brine was displaced in the Open Hole. A thorough hole cleaning procedure was formulated and was applied to all the wells.\n After analyzing over 5 wells, it was observed that in both runs, the one with 6″ BHA compared to dedicated cleanout-trip, the torque and drag values were similar and the effective reduction in friction factor was similar. This supported the elimination of planned dedicated cleanout trip and saved average 2 days/well and 27MM$ for year 2022.\n This optimized BHA design with enhanced hole cleaning procedure was a keystone in deploying slim 4-1/2″ lower completion in WBM system. This practice led to successful deployment of First Slim Hole ERD in UAE with 15000ft of 4-1/2″ lower completion with WBM system. This was a one-of-a-kind achievement in UAE.","PeriodicalId":249690,"journal":{"name":"Day 2 Tue, November 01, 2022","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Innovative Wellbore Cleanup Solution for Non-Cemented Lower Completions Saves 27 Million$ in ADNOC Onshore\",\"authors\":\"E. Varma, P. Mwansa, M. Husien, Abdul Raman Bin Bahrom, Raymond Saragi, Ali Sulaiman Ahmed BinSumaida, Musabbeh Khamis Al Samahi, El Walid Ben Mohamed El Moumni, Juma Sulaiman Al Shamsi, Ahmad Othman Alshaigy, Anchit Gaurav, Khaled Abdelhalim\",\"doi\":\"10.2118/211548-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The long-term development of any mature field requires a fresh perspective of long MRC (Maximum reservoir contact) wells and increased well accessibility. To improve well accessibility the deployment of lower completion has been a mandate. Onshore UAE Field demands drilling Slim hole (6″ /6-1/8″ ) laterals and Slim Hole ERD (Extended reach drilling) wells with 4.5″ Uncemented Lower Completion. This paper highlights the innovative wellbore cleanout procedure prior installation of Lower Completions.\\n Conventionally, using Water Based Mud (WBM) with high friction factors in 6″ Horizontal Hole (HH), two trips were required to reduce the friction factor prior running the Lower Completion. The optimized solution allowed wellbore clean-up and displacement of brine in one trip with drilling assembly (BHA). This innovative technique eliminated one dedicated trip for wellbore cleanout and thus saved millions in CAPEX and Business Plan days.\\n The T&D data for 5 wells with dedicated cleanout trip were compared to clean-out with 6″ drilling BHA with viscous-lubricated brine. The 6″ BHA was optimized to fit with innovative dormant drilling scrapper and lubricated viscous brine was displaced in the Open Hole. A thorough hole cleaning procedure was formulated and was applied to all the wells.\\n After analyzing over 5 wells, it was observed that in both runs, the one with 6″ BHA compared to dedicated cleanout-trip, the torque and drag values were similar and the effective reduction in friction factor was similar. This supported the elimination of planned dedicated cleanout trip and saved average 2 days/well and 27MM$ for year 2022.\\n This optimized BHA design with enhanced hole cleaning procedure was a keystone in deploying slim 4-1/2″ lower completion in WBM system. This practice led to successful deployment of First Slim Hole ERD in UAE with 15000ft of 4-1/2″ lower completion with WBM system. This was a one-of-a-kind achievement in UAE.\",\"PeriodicalId\":249690,\"journal\":{\"name\":\"Day 2 Tue, November 01, 2022\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 01, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/211548-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 01, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/211548-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

任何成熟油田的长期开发都需要对长MRC(最大储层接触)井进行全新的认识,并提高井的可达性。为了提高井的可达性,部署低完井已经成为一项任务。阿联酋陆上油田要求钻小井眼(6″/6-1/8″)分支井和小井眼大位移井(ERD), 4.5″无胶结下完井。本文重点介绍了在安装下完井之前的创新井筒清洗程序。通常,在6″水平井(HH)中使用具有高摩擦系数的水基泥浆(WBM),在下完井之前需要两次起下钻以降低摩擦系数。优化后的解决方案可以在一次下钻中使用钻具组合(BHA)进行井筒清理和盐水置换。这项创新技术省去了一次专门的井眼清洗作业,从而节省了数百万美元的资本支出和商业计划时间。将5口专用洗井井的T&D数据与6口使用黏液润滑盐水的″钻井BHA进行了对比。对6″井下钻具组合进行了优化,以适应创新的休眠钻井刮砂器,并在裸眼井中置换润滑的粘性盐水。制定了一套彻底的井眼清洗程序,并应用于所有井。在对5口井进行分析后,我们发现,与专用洗井起下钻相比,使用6″BHA的两次下入,扭矩和阻力值相似,有效降低的摩擦系数也相似。这消除了计划中的专用清洗行程,平均每口井节省2天,为2022年节省2700万美元。这种优化的底部钻具组合设计和改进的井眼清洗程序是在WBM系统中部署4-1/2″下完井的关键。该实践成功地在阿联酋部署了第一个小井眼ERD,使用WBM系统完成了15000英尺的4-1/2″低完井。这在阿联酋是独一无二的成就。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Innovative Wellbore Cleanup Solution for Non-Cemented Lower Completions Saves 27 Million$ in ADNOC Onshore
The long-term development of any mature field requires a fresh perspective of long MRC (Maximum reservoir contact) wells and increased well accessibility. To improve well accessibility the deployment of lower completion has been a mandate. Onshore UAE Field demands drilling Slim hole (6″ /6-1/8″ ) laterals and Slim Hole ERD (Extended reach drilling) wells with 4.5″ Uncemented Lower Completion. This paper highlights the innovative wellbore cleanout procedure prior installation of Lower Completions. Conventionally, using Water Based Mud (WBM) with high friction factors in 6″ Horizontal Hole (HH), two trips were required to reduce the friction factor prior running the Lower Completion. The optimized solution allowed wellbore clean-up and displacement of brine in one trip with drilling assembly (BHA). This innovative technique eliminated one dedicated trip for wellbore cleanout and thus saved millions in CAPEX and Business Plan days. The T&D data for 5 wells with dedicated cleanout trip were compared to clean-out with 6″ drilling BHA with viscous-lubricated brine. The 6″ BHA was optimized to fit with innovative dormant drilling scrapper and lubricated viscous brine was displaced in the Open Hole. A thorough hole cleaning procedure was formulated and was applied to all the wells. After analyzing over 5 wells, it was observed that in both runs, the one with 6″ BHA compared to dedicated cleanout-trip, the torque and drag values were similar and the effective reduction in friction factor was similar. This supported the elimination of planned dedicated cleanout trip and saved average 2 days/well and 27MM$ for year 2022. This optimized BHA design with enhanced hole cleaning procedure was a keystone in deploying slim 4-1/2″ lower completion in WBM system. This practice led to successful deployment of First Slim Hole ERD in UAE with 15000ft of 4-1/2″ lower completion with WBM system. This was a one-of-a-kind achievement in UAE.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信