{"title":"考虑车辆到电网的10kW电动汽车快速充电器(V2G)","authors":"Ga-Gang Choi, Doo-yong Jung, Sung-chon Choi, C. Won, Yong-Chae Jung, Jang-Hyoun Youm","doi":"10.1109/IPEMC.2012.6259283","DOIUrl":null,"url":null,"abstract":"Because of the quantity of demand power depends on the power consumption of power demands on the loads, the utility grid has to secure a supply of electric energy which is larger than the required power consumption under peak load-condition. It means that the waste of electric power could be heavy at the other time than peak-load period. To avoid the waste of power, a 10kW rapid-charger system which has a function of load compensation at the peak-load condition is proposed in this paper. At the peak-load condition, the rapid charger transfer charged energy in the battery of electric vehicle to the grid. The 10kW rapid-charger for electric vehicle is comprised of the three-phase AC-DC PWM converter and isolated bidirectional DC-DC converter. Proposed V2G operation is verified through simulation experiment performed by 10kW rapid-charger.","PeriodicalId":236136,"journal":{"name":"Proceedings of The 7th International Power Electronics and Motion Control Conference","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"10kW rapid-charger for electric vehicle considering vehicle to grid(V2G)\",\"authors\":\"Ga-Gang Choi, Doo-yong Jung, Sung-chon Choi, C. Won, Yong-Chae Jung, Jang-Hyoun Youm\",\"doi\":\"10.1109/IPEMC.2012.6259283\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Because of the quantity of demand power depends on the power consumption of power demands on the loads, the utility grid has to secure a supply of electric energy which is larger than the required power consumption under peak load-condition. It means that the waste of electric power could be heavy at the other time than peak-load period. To avoid the waste of power, a 10kW rapid-charger system which has a function of load compensation at the peak-load condition is proposed in this paper. At the peak-load condition, the rapid charger transfer charged energy in the battery of electric vehicle to the grid. The 10kW rapid-charger for electric vehicle is comprised of the three-phase AC-DC PWM converter and isolated bidirectional DC-DC converter. Proposed V2G operation is verified through simulation experiment performed by 10kW rapid-charger.\",\"PeriodicalId\":236136,\"journal\":{\"name\":\"Proceedings of The 7th International Power Electronics and Motion Control Conference\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-06-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of The 7th International Power Electronics and Motion Control Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IPEMC.2012.6259283\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of The 7th International Power Electronics and Motion Control Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEMC.2012.6259283","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
10kW rapid-charger for electric vehicle considering vehicle to grid(V2G)
Because of the quantity of demand power depends on the power consumption of power demands on the loads, the utility grid has to secure a supply of electric energy which is larger than the required power consumption under peak load-condition. It means that the waste of electric power could be heavy at the other time than peak-load period. To avoid the waste of power, a 10kW rapid-charger system which has a function of load compensation at the peak-load condition is proposed in this paper. At the peak-load condition, the rapid charger transfer charged energy in the battery of electric vehicle to the grid. The 10kW rapid-charger for electric vehicle is comprised of the three-phase AC-DC PWM converter and isolated bidirectional DC-DC converter. Proposed V2G operation is verified through simulation experiment performed by 10kW rapid-charger.