{"title":"复杂生产系统:非线性和非重复项目","authors":"Danny Murguia, A. Urbina","doi":"10.24928/2018/0222","DOIUrl":null,"url":null,"abstract":"In most residential building construction, the production system design relies on the assumption of linearity per zone and per story, thus, takt-time schedules and flow lines are produced accordingly. However, in practice, such smoothness is difficult to achieve due to non-linear and non-repetitive projects. This research aims to identify the main challenges of the production system design when a planning team faces such projects. To achieve this objective, lean scheduling methods are analysed by a complex production system framework including: variety of tasks, task interdependence, supply chain interdependence, and work density. Two simulation case studies are presented. First, the finishing phase of a residential building presents the case of a non-linear project. Second, the structural works of an industrial project presents the challenges of a non-repetitive project. The main finding is that non-repetitive projects can be handled as multiple repetitive non-linear stages. However, the main challenges include the reciprocal interdependence between trade contractors, the work density disparity between locations and trades, the capacity buffer design, and production rates predictions for the assembly of one-off products. This research contributes to the understanding of scheduling in projects where the linearity assumption of activities is violated.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Complex Production Systems: Non-Linear and Non-Repetitive Projects\",\"authors\":\"Danny Murguia, A. Urbina\",\"doi\":\"10.24928/2018/0222\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In most residential building construction, the production system design relies on the assumption of linearity per zone and per story, thus, takt-time schedules and flow lines are produced accordingly. However, in practice, such smoothness is difficult to achieve due to non-linear and non-repetitive projects. This research aims to identify the main challenges of the production system design when a planning team faces such projects. To achieve this objective, lean scheduling methods are analysed by a complex production system framework including: variety of tasks, task interdependence, supply chain interdependence, and work density. Two simulation case studies are presented. First, the finishing phase of a residential building presents the case of a non-linear project. Second, the structural works of an industrial project presents the challenges of a non-repetitive project. The main finding is that non-repetitive projects can be handled as multiple repetitive non-linear stages. However, the main challenges include the reciprocal interdependence between trade contractors, the work density disparity between locations and trades, the capacity buffer design, and production rates predictions for the assembly of one-off products. This research contributes to the understanding of scheduling in projects where the linearity assumption of activities is violated.\",\"PeriodicalId\":419313,\"journal\":{\"name\":\"26th Annual Conference of the International Group for Lean Construction\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"26th Annual Conference of the International Group for Lean Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2018/0222\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0222","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

在大多数住宅建筑施工中,生产系统设计依赖于每个区域和每个楼层的线性假设,因此相应地产生了节拍时间表和流线。然而,在实践中,由于项目的非线性和非重复性,这种平滑性很难实现。本研究旨在确定当计划团队面对此类项目时,生产系统设计的主要挑战。为了实现这一目标,精益调度方法通过一个复杂的生产系统框架进行分析,包括:任务的多样性、任务的相互依赖性、供应链的相互依赖性和工作密度。给出了两个仿真案例研究。首先,住宅建筑的收尾阶段是一个非线性项目。其次,工业项目的结构工程提出了非重复项目的挑战。主要发现是,非重复性项目可以作为多个重复的非线性阶段来处理。然而,主要的挑战包括贸易承包商之间的相互依赖、地点和行业之间的工作密度差异、产能缓冲设计以及一次性产品组装的生产率预测。本研究有助于理解在违反活动线性假设的项目中安排工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Complex Production Systems: Non-Linear and Non-Repetitive Projects
In most residential building construction, the production system design relies on the assumption of linearity per zone and per story, thus, takt-time schedules and flow lines are produced accordingly. However, in practice, such smoothness is difficult to achieve due to non-linear and non-repetitive projects. This research aims to identify the main challenges of the production system design when a planning team faces such projects. To achieve this objective, lean scheduling methods are analysed by a complex production system framework including: variety of tasks, task interdependence, supply chain interdependence, and work density. Two simulation case studies are presented. First, the finishing phase of a residential building presents the case of a non-linear project. Second, the structural works of an industrial project presents the challenges of a non-repetitive project. The main finding is that non-repetitive projects can be handled as multiple repetitive non-linear stages. However, the main challenges include the reciprocal interdependence between trade contractors, the work density disparity between locations and trades, the capacity buffer design, and production rates predictions for the assembly of one-off products. This research contributes to the understanding of scheduling in projects where the linearity assumption of activities is violated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信