{"title":"无接触线轻轨交通快速充电能耗研究","authors":"Chalita Jobsoongnern, T. Ratniyomchai, T. Kulworawanichpong","doi":"10.1109/ICPEI49860.2020.9431573","DOIUrl":null,"url":null,"abstract":"This paper presents the energy consumption study of catenary free light rail transit system using an on-board battery system as a main motive power source. This paper proposes a case study of energy consumption which has 3 sub-cases of charging points: i) charging at every stop, ii) charging at every 5 stops and charging once after one round trip. The charge is conducted by a rapid charge at the charging stop with dwell time of 20 seconds. By using the route of Korat Light Rail Transit Green Line project in Nakhon Ratchasima, Thailand that are 20 passenger stops and a total round-trip distance of 22 km. The total energy consumption for one round trip of the route is 136.866 kWh. For the different 3 cases, the different charging point effect to energy consumption, battery size and the cost of the battery. The longer the distance between the two consecutive charging points, the larger the kWh capacity of the on-board battery for the vehicle.","PeriodicalId":342582,"journal":{"name":"2020 International Conference on Power, Energy and Innovations (ICPEI)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Energy Consumption Study of Rapid Charging of Catenary Free Light Rail Transit\",\"authors\":\"Chalita Jobsoongnern, T. Ratniyomchai, T. Kulworawanichpong\",\"doi\":\"10.1109/ICPEI49860.2020.9431573\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the energy consumption study of catenary free light rail transit system using an on-board battery system as a main motive power source. This paper proposes a case study of energy consumption which has 3 sub-cases of charging points: i) charging at every stop, ii) charging at every 5 stops and charging once after one round trip. The charge is conducted by a rapid charge at the charging stop with dwell time of 20 seconds. By using the route of Korat Light Rail Transit Green Line project in Nakhon Ratchasima, Thailand that are 20 passenger stops and a total round-trip distance of 22 km. The total energy consumption for one round trip of the route is 136.866 kWh. For the different 3 cases, the different charging point effect to energy consumption, battery size and the cost of the battery. The longer the distance between the two consecutive charging points, the larger the kWh capacity of the on-board battery for the vehicle.\",\"PeriodicalId\":342582,\"journal\":{\"name\":\"2020 International Conference on Power, Energy and Innovations (ICPEI)\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Conference on Power, Energy and Innovations (ICPEI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPEI49860.2020.9431573\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Power, Energy and Innovations (ICPEI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPEI49860.2020.9431573","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文对以车载蓄电池系统为主要动力源的无接触网轻轨交通系统的能耗进行了研究。本文提出了一个能源消耗案例研究,该案例将充电点分为3个子案例:1)每站充电,2)每5站充电,1次往返充电。在充电站进行快速充电,停留时间为20秒。通过使用泰国叻叻轻轨绿线项目的路线,该项目有20个乘客站,总往返距离为22公里。该线路往返一次总能耗为136.866千瓦时。对于不同的3种情况,不同的充电点对能量消耗,电池尺寸和电池成本的影响。两个连续充电点之间的距离越长,车载电池的千瓦时容量就越大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Energy Consumption Study of Rapid Charging of Catenary Free Light Rail Transit
This paper presents the energy consumption study of catenary free light rail transit system using an on-board battery system as a main motive power source. This paper proposes a case study of energy consumption which has 3 sub-cases of charging points: i) charging at every stop, ii) charging at every 5 stops and charging once after one round trip. The charge is conducted by a rapid charge at the charging stop with dwell time of 20 seconds. By using the route of Korat Light Rail Transit Green Line project in Nakhon Ratchasima, Thailand that are 20 passenger stops and a total round-trip distance of 22 km. The total energy consumption for one round trip of the route is 136.866 kWh. For the different 3 cases, the different charging point effect to energy consumption, battery size and the cost of the battery. The longer the distance between the two consecutive charging points, the larger the kWh capacity of the on-board battery for the vehicle.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信