一种新型电池储能风电场短期调度方案

F. Luo, Zhaoyang Dong, Y. Y. Chen, K. Meng, Guo Chen, Huiqiao Tian, K. Wong
{"title":"一种新型电池储能风电场短期调度方案","authors":"F. Luo, Zhaoyang Dong, Y. Y. Chen, K. Meng, Guo Chen, Huiqiao Tian, K. Wong","doi":"10.1109/PESMG.2013.6672574","DOIUrl":null,"url":null,"abstract":"In order to mitigate the high fluctuations of the wind power and stabilize the power output of the wind farm, a novel coordinated short-term dispatch scheme for the wind farm equipped with battery energy storage system (BESS) is proposed. The proposed dispatch scheme uses three different wind power forecast scenarios to regularly fully charge and discharge the BESS within its operational SOC limits, so as to maximize the potential storage ability and utility of the BESS and prolong the life time of the BESS. Based on the lead-acid battery model provided by SIMSCAPE/Matlab 2011, two simulation cases are designed to observe the wind farm power out and the BESS charging and discharging behaviors.","PeriodicalId":433870,"journal":{"name":"2013 IEEE Power & Energy Society General Meeting","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A novel short-term dispatch scheme for wind farm with battery energy storage system\",\"authors\":\"F. Luo, Zhaoyang Dong, Y. Y. Chen, K. Meng, Guo Chen, Huiqiao Tian, K. Wong\",\"doi\":\"10.1109/PESMG.2013.6672574\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to mitigate the high fluctuations of the wind power and stabilize the power output of the wind farm, a novel coordinated short-term dispatch scheme for the wind farm equipped with battery energy storage system (BESS) is proposed. The proposed dispatch scheme uses three different wind power forecast scenarios to regularly fully charge and discharge the BESS within its operational SOC limits, so as to maximize the potential storage ability and utility of the BESS and prolong the life time of the BESS. Based on the lead-acid battery model provided by SIMSCAPE/Matlab 2011, two simulation cases are designed to observe the wind farm power out and the BESS charging and discharging behaviors.\",\"PeriodicalId\":433870,\"journal\":{\"name\":\"2013 IEEE Power & Energy Society General Meeting\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-07-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE Power & Energy Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESMG.2013.6672574\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESMG.2013.6672574","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

为了缓解风力发电的高波动,稳定风电场的输出功率,提出了一种新型的电池储能系统(BESS)风电场协调短期调度方案。本文提出的调度方案采用三种不同的风电预测情景,在BESS的运行荷电范围内定期对BESS进行完全充放电,以最大限度地发挥BESS的潜在储能能力和效用,延长BESS的使用寿命。基于SIMSCAPE/Matlab 2011提供的铅酸蓄电池模型,设计了两个仿真案例,分别观察风电场出电和BESS充放电行为。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A novel short-term dispatch scheme for wind farm with battery energy storage system
In order to mitigate the high fluctuations of the wind power and stabilize the power output of the wind farm, a novel coordinated short-term dispatch scheme for the wind farm equipped with battery energy storage system (BESS) is proposed. The proposed dispatch scheme uses three different wind power forecast scenarios to regularly fully charge and discharge the BESS within its operational SOC limits, so as to maximize the potential storage ability and utility of the BESS and prolong the life time of the BESS. Based on the lead-acid battery model provided by SIMSCAPE/Matlab 2011, two simulation cases are designed to observe the wind farm power out and the BESS charging and discharging behaviors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信