{"title":"标题10,第2366a节认证要求和陆军早期成本估算","authors":"Stephen Bagby","doi":"10.1080/1941658X.2009.10462220","DOIUrl":null,"url":null,"abstract":"For the past few years Department of Defense (DoD) budget reductions have been looming just at the edge of the horizon, and now those budget limitations are upon us. The cost parameter will now play a greater role in the decision-making process than it did in the past. Leaders will rely on quality cost estimates to aid their decisions as competition for limited resources increases. The Army will have to provide cost estimates earlier in the lifecycle process and show proof that programs are funded in accordance with the estimates.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Title 10, Section 2366a Certification Requirements and Early Cost Estimating in the Army\",\"authors\":\"Stephen Bagby\",\"doi\":\"10.1080/1941658X.2009.10462220\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For the past few years Department of Defense (DoD) budget reductions have been looming just at the edge of the horizon, and now those budget limitations are upon us. The cost parameter will now play a greater role in the decision-making process than it did in the past. Leaders will rely on quality cost estimates to aid their decisions as competition for limited resources increases. The Army will have to provide cost estimates earlier in the lifecycle process and show proof that programs are funded in accordance with the estimates.\",\"PeriodicalId\":390877,\"journal\":{\"name\":\"Journal of Cost Analysis and Parametrics\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Cost Analysis and Parametrics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/1941658X.2009.10462220\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2009.10462220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Title 10, Section 2366a Certification Requirements and Early Cost Estimating in the Army
For the past few years Department of Defense (DoD) budget reductions have been looming just at the edge of the horizon, and now those budget limitations are upon us. The cost parameter will now play a greater role in the decision-making process than it did in the past. Leaders will rely on quality cost estimates to aid their decisions as competition for limited resources increases. The Army will have to provide cost estimates earlier in the lifecycle process and show proof that programs are funded in accordance with the estimates.