{"title":"在电力市场放松管制的情况下,评估同步发电机断路器对电厂变电站母线布置可靠性的影响","authors":"M. Banejad, R. Hooshmand, M. Moazzami","doi":"10.1109/EEM.2008.4579114","DOIUrl":null,"url":null,"abstract":"One important issue in power plants is the reliability. In the power systems, the power plant outage is a critical situation and as a matter of fact, the layout and the configuration has direct effect on the outage. In this paper, the effects of synchronous generator circuit breakers (SGCB) on the one & half and two circuit breaker layouts are investigated. In the simulation of this paper, the minimal cut set and path are employed. The results of the simulation and economic evaluations demonstrate the SGCB increases the reliability indices as well as reducing the cost in the deregulated electricity markets.","PeriodicalId":118618,"journal":{"name":"2008 5th International Conference on the European Electricity Market","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Evaluation the effects of the synchronous generator circuit breaker on the reliability of busbar layout in power plant substation in deregulated electricity market\",\"authors\":\"M. Banejad, R. Hooshmand, M. Moazzami\",\"doi\":\"10.1109/EEM.2008.4579114\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One important issue in power plants is the reliability. In the power systems, the power plant outage is a critical situation and as a matter of fact, the layout and the configuration has direct effect on the outage. In this paper, the effects of synchronous generator circuit breakers (SGCB) on the one & half and two circuit breaker layouts are investigated. In the simulation of this paper, the minimal cut set and path are employed. The results of the simulation and economic evaluations demonstrate the SGCB increases the reliability indices as well as reducing the cost in the deregulated electricity markets.\",\"PeriodicalId\":118618,\"journal\":{\"name\":\"2008 5th International Conference on the European Electricity Market\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 5th International Conference on the European Electricity Market\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2008.4579114\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 5th International Conference on the European Electricity Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2008.4579114","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

发电厂的一个重要问题是可靠性。在电力系统中,电厂的停运是一种紧急情况,而电厂的布局和配置直接影响着电厂的停运。本文研究了同步发电机断路器(SGCB)对一个半断路器和两个断路器布局的影响。在本文的仿真中,采用了最小割集和路径。仿真和经济评估结果表明,在放松管制的电力市场上,SGCB提高了可靠性指标,降低了成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation the effects of the synchronous generator circuit breaker on the reliability of busbar layout in power plant substation in deregulated electricity market
One important issue in power plants is the reliability. In the power systems, the power plant outage is a critical situation and as a matter of fact, the layout and the configuration has direct effect on the outage. In this paper, the effects of synchronous generator circuit breakers (SGCB) on the one & half and two circuit breaker layouts are investigated. In the simulation of this paper, the minimal cut set and path are employed. The results of the simulation and economic evaluations demonstrate the SGCB increases the reliability indices as well as reducing the cost in the deregulated electricity markets.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信