Bowen Zhang, Libao Shi, Y. Ni, L. Yao, M. Bazargan
{"title":"基于贪心算法的最优多目标单元启动策略","authors":"Bowen Zhang, Libao Shi, Y. Ni, L. Yao, M. Bazargan","doi":"10.1109/TENCON.2013.6718881","DOIUrl":null,"url":null,"abstract":"In this paper, a multi-objective units start-up optimization strategy is proposed. In the proposed model, the economic factors during generator start-up are introduced into the conventional units start-up objective function. Furthermore, the system frequency characteristics as well as generator ramp constraints are considered during analysis. The greedy algorithm is employed to solve the proposed model. Finally, the case studies are carried out based on the IEEE 30-bus test system as benchmark to demonstrate the effectiveness and validity of the proposed model and method.","PeriodicalId":425023,"journal":{"name":"2013 IEEE International Conference of IEEE Region 10 (TENCON 2013)","volume":"60 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimal multi-objective units start-up strategy based on greedy algorithm\",\"authors\":\"Bowen Zhang, Libao Shi, Y. Ni, L. Yao, M. Bazargan\",\"doi\":\"10.1109/TENCON.2013.6718881\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a multi-objective units start-up optimization strategy is proposed. In the proposed model, the economic factors during generator start-up are introduced into the conventional units start-up objective function. Furthermore, the system frequency characteristics as well as generator ramp constraints are considered during analysis. The greedy algorithm is employed to solve the proposed model. Finally, the case studies are carried out based on the IEEE 30-bus test system as benchmark to demonstrate the effectiveness and validity of the proposed model and method.\",\"PeriodicalId\":425023,\"journal\":{\"name\":\"2013 IEEE International Conference of IEEE Region 10 (TENCON 2013)\",\"volume\":\"60 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference of IEEE Region 10 (TENCON 2013)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TENCON.2013.6718881\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference of IEEE Region 10 (TENCON 2013)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TENCON.2013.6718881","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimal multi-objective units start-up strategy based on greedy algorithm
In this paper, a multi-objective units start-up optimization strategy is proposed. In the proposed model, the economic factors during generator start-up are introduced into the conventional units start-up objective function. Furthermore, the system frequency characteristics as well as generator ramp constraints are considered during analysis. The greedy algorithm is employed to solve the proposed model. Finally, the case studies are carried out based on the IEEE 30-bus test system as benchmark to demonstrate the effectiveness and validity of the proposed model and method.