{"title":"尼日尔三角洲超薄水平井的成本优化设计——Eremor油田案例研究","authors":"U. Okoli, H. Okwa, S. Adebayo, Ifiok Mkpong","doi":"10.2118/212041-ms","DOIUrl":null,"url":null,"abstract":"\n Oil price volatility is one of the major drivers, which drive the decision of Operators to drill oil wells to further develop oil fields. A more significant constraint, which deals a huge blow on the Marginal Field Operators in the Niger Delta is the huge and ‘unavailable’ CAPEX associated to the delivery of these wells.\n This paper elucidates how ‘detailed’ well design and optimization were used to design and deliver two swamp wells for a Marginal Field operator in the Niger Delta. With the application of detailed engineering and optimization processes, the well costs were reduced by over 50%.\n The wells were initially designed, and to be delivered for circa $13MM per well, which is the P50 cost of drilling Swamp wells in the Niger Delta. However, post design optimization, the wells were designed and delivered for circa 6.5MM per Well.\n The paper also details the drilling execution methods put in place to ensure that the wells designed were delivered efficiently.","PeriodicalId":399294,"journal":{"name":"Day 2 Tue, August 02, 2022","volume":"74 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cost Optimization by Designing an Ultra-Slim Horizontal Well in the Niger Delta – The Eremor Field Case Study\",\"authors\":\"U. Okoli, H. Okwa, S. Adebayo, Ifiok Mkpong\",\"doi\":\"10.2118/212041-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Oil price volatility is one of the major drivers, which drive the decision of Operators to drill oil wells to further develop oil fields. A more significant constraint, which deals a huge blow on the Marginal Field Operators in the Niger Delta is the huge and ‘unavailable’ CAPEX associated to the delivery of these wells.\\n This paper elucidates how ‘detailed’ well design and optimization were used to design and deliver two swamp wells for a Marginal Field operator in the Niger Delta. With the application of detailed engineering and optimization processes, the well costs were reduced by over 50%.\\n The wells were initially designed, and to be delivered for circa $13MM per well, which is the P50 cost of drilling Swamp wells in the Niger Delta. However, post design optimization, the wells were designed and delivered for circa 6.5MM per Well.\\n The paper also details the drilling execution methods put in place to ensure that the wells designed were delivered efficiently.\",\"PeriodicalId\":399294,\"journal\":{\"name\":\"Day 2 Tue, August 02, 2022\",\"volume\":\"74 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, August 02, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/212041-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, August 02, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/212041-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

油价波动是主要的驱动因素之一,它促使作业者决定钻井以进一步开发油田。对于尼日尔三角洲的边际油田运营商来说,一个更重要的制约因素是这些井的交付所带来的巨大且“不可用”的资本支出。本文阐述了“详细”井设计和优化是如何应用于尼日尔三角洲边际油田的两口沼泽井的设计和交付的。通过详细的工程和优化流程的应用,油井成本降低了50%以上。这些井最初的设计和交付成本约为每口井1300万美元,这是尼日尔三角洲沼泽井的50美元钻井成本。然而,在设计优化后,每口井的设计和交付尺寸约为6.5毫米。本文还详细介绍了钻井执行方法,以确保设计的井能够高效交付。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cost Optimization by Designing an Ultra-Slim Horizontal Well in the Niger Delta – The Eremor Field Case Study
Oil price volatility is one of the major drivers, which drive the decision of Operators to drill oil wells to further develop oil fields. A more significant constraint, which deals a huge blow on the Marginal Field Operators in the Niger Delta is the huge and ‘unavailable’ CAPEX associated to the delivery of these wells. This paper elucidates how ‘detailed’ well design and optimization were used to design and deliver two swamp wells for a Marginal Field operator in the Niger Delta. With the application of detailed engineering and optimization processes, the well costs were reduced by over 50%. The wells were initially designed, and to be delivered for circa $13MM per well, which is the P50 cost of drilling Swamp wells in the Niger Delta. However, post design optimization, the wells were designed and delivered for circa 6.5MM per Well. The paper also details the drilling execution methods put in place to ensure that the wells designed were delivered efficiently.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信