{"title":"加州市场的经验教训","authors":"J.H. Yan","doi":"10.1109/PES.2003.1267200","DOIUrl":null,"url":null,"abstract":"Summary form only given. In April of 1998, wholesale electricity in California was deregulated, and spot markets created in the power exchange (PX) and the Independent System Operator (ISO) included the day-ahead energy and ancillary service markets, the hour-ahead energy and ancillary service markets, and the real-time energy market. Sellers could bid their energy, four types of ancillary services, and incremental and decremental energy for congestion separately for each day-ahead and hour-ahead market sequentially, and then could bid their remaining energy to the ISO real-time energy market. At same time, the physical aspects of the electricity system and resource feasibilities were frequently ignored. The energy crisis in 2000 and 2001 demonstrated that this sequential and separable market structure was fundamentally flawed. In the light of the market failure in California and FERC standard market design, the California ISO started market redesign activities, including the development of its market design proposal, MD02, and an extensive stakeholders' process. This presentation will provide a summary of the problems that existed and the lessons learned, and indications of how the ISO addressed the issues of market failures in the 2000 - 2001 energy crisis.","PeriodicalId":131986,"journal":{"name":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-07-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lessons learned from California market\",\"authors\":\"J.H. Yan\",\"doi\":\"10.1109/PES.2003.1267200\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary form only given. In April of 1998, wholesale electricity in California was deregulated, and spot markets created in the power exchange (PX) and the Independent System Operator (ISO) included the day-ahead energy and ancillary service markets, the hour-ahead energy and ancillary service markets, and the real-time energy market. Sellers could bid their energy, four types of ancillary services, and incremental and decremental energy for congestion separately for each day-ahead and hour-ahead market sequentially, and then could bid their remaining energy to the ISO real-time energy market. At same time, the physical aspects of the electricity system and resource feasibilities were frequently ignored. The energy crisis in 2000 and 2001 demonstrated that this sequential and separable market structure was fundamentally flawed. In the light of the market failure in California and FERC standard market design, the California ISO started market redesign activities, including the development of its market design proposal, MD02, and an extensive stakeholders' process. This presentation will provide a summary of the problems that existed and the lessons learned, and indications of how the ISO addressed the issues of market failures in the 2000 - 2001 energy crisis.\",\"PeriodicalId\":131986,\"journal\":{\"name\":\"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)\",\"volume\":\"67 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-07-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2003.1267200\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2003.1267200","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

只提供摘要形式。1998年4月,加州解除了对批发电力的管制,电力交易所(PX)和独立系统运营商(ISO)创建了现货市场,包括日前能源和辅助服务市场、小时前能源和辅助服务市场以及实时能源市场。卖方可以依次在日前和小时前市场分别对其能源、四种辅助服务、拥堵增量和减少能源进行竞价,然后将剩余能源竞价给ISO实时能源市场。同时,电力系统的物理方面和资源可行性经常被忽视。2000年和2001年的能源危机表明,这种顺序的、可分离的市场结构存在根本性缺陷。鉴于加州和FERC标准市场设计的市场失灵,加州ISO开始了市场重新设计活动,包括制定其市场设计提案MD02和广泛的利益相关者过程。本报告将总结存在的问题和吸取的教训,并说明ISO如何解决2000 - 2001年能源危机中市场失灵的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lessons learned from California market
Summary form only given. In April of 1998, wholesale electricity in California was deregulated, and spot markets created in the power exchange (PX) and the Independent System Operator (ISO) included the day-ahead energy and ancillary service markets, the hour-ahead energy and ancillary service markets, and the real-time energy market. Sellers could bid their energy, four types of ancillary services, and incremental and decremental energy for congestion separately for each day-ahead and hour-ahead market sequentially, and then could bid their remaining energy to the ISO real-time energy market. At same time, the physical aspects of the electricity system and resource feasibilities were frequently ignored. The energy crisis in 2000 and 2001 demonstrated that this sequential and separable market structure was fundamentally flawed. In the light of the market failure in California and FERC standard market design, the California ISO started market redesign activities, including the development of its market design proposal, MD02, and an extensive stakeholders' process. This presentation will provide a summary of the problems that existed and the lessons learned, and indications of how the ISO addressed the issues of market failures in the 2000 - 2001 energy crisis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信