{"title":"Live rehabilitation of 400kV OHL Mintia-Sibiu","authors":"M. Oltean, I. Sevastre, Dorin Lucian Brabete, I. Rodean","doi":"10.1109/ICOLIM.2014.6934348","DOIUrl":null,"url":null,"abstract":"The 400kV Mintia-Sibiu OHL was build in 1971-1972. In 2011-2013 National Transmission Company (CN Transelectrica SA) performed a refurbishment project for the OHL elements. A part of this large project is executed in LW technology by the maintenance subsidiary of Transelectrica (SC Smart SA). The live working part of project consist of: replacement of suspension insulation strings, replacement of insulation chain elements, replacement of dampers, replacement of vibration dampers, Installation of armour-rods together with suspension clamps, painting, Installation of aerial plates on towers, replacement of damaged tower elements. The work was done using some new methods for access on the conductors, including the aerial insulating platform class A. When a project starts we should consider all the ways to complete the works. Considering present technologies used in Romania some works needs deenergization of the line. For other parts of the project Live Working is mandatory, in order to maintain the system's stability. At the end of the project an economical analysis is done. Was it efficient to use Live Maintenance technologies?","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934348","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

400kV Mintia-Sibiu OHL建于1971-1972年。2011-2013年,国家输电公司(CN transelecica SA)对OHL元件进行了翻新项目。这个大型项目的一部分由transselecica (SC Smart SA)的维护子公司执行LW技术。本工程带电工作部分包括:更换悬架绝缘串、更换绝缘链元件、更换阻尼器、更换减振器、安装护杆及悬挂夹、喷漆、安装塔架架空板、更换损坏的塔架元件。这项工作采用了一些新的方法来接近导线,包括a级架空绝缘平台。当一个项目开始时,我们应该考虑所有的方法来完成工作。考虑到罗马尼亚目前使用的技术,一些工程需要对线路进行断电。对于项目的其他部分,Live Working是强制性的,以保持系统的稳定性。在项目的最后进行了经济分析。使用实时维护技术是否有效?
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Live rehabilitation of 400kV OHL Mintia-Sibiu
The 400kV Mintia-Sibiu OHL was build in 1971-1972. In 2011-2013 National Transmission Company (CN Transelectrica SA) performed a refurbishment project for the OHL elements. A part of this large project is executed in LW technology by the maintenance subsidiary of Transelectrica (SC Smart SA). The live working part of project consist of: replacement of suspension insulation strings, replacement of insulation chain elements, replacement of dampers, replacement of vibration dampers, Installation of armour-rods together with suspension clamps, painting, Installation of aerial plates on towers, replacement of damaged tower elements. The work was done using some new methods for access on the conductors, including the aerial insulating platform class A. When a project starts we should consider all the ways to complete the works. Considering present technologies used in Romania some works needs deenergization of the line. For other parts of the project Live Working is mandatory, in order to maintain the system's stability. At the end of the project an economical analysis is done. Was it efficient to use Live Maintenance technologies?
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信