双资源约束下作业车间调度的启发式优化

H. Ren, Lili Jiang, Xiaoying Xi, Muzhi Li
{"title":"双资源约束下作业车间调度的启发式优化","authors":"H. Ren, Lili Jiang, Xiaoying Xi, Muzhi Li","doi":"10.1109/CAR.2009.113","DOIUrl":null,"url":null,"abstract":"In the study of job shop scheduling problem in mass injection molding processing enterprises, the practical job shop scheduling environment cannot be mirrored in the traditional study only considering machine resources. A dual-resource (machines and moulds) constrained job shop scheduling problem model was established in this paper, according to the actual factors of mass injection molding processing job shop scheduling. A heuristic active algorithm combined with priority rules is employed to give the solution. Finally, an example is made to illustrate the algorithm, whose schedule result is shown with a Gantt chart.","PeriodicalId":320307,"journal":{"name":"2009 International Asia Conference on Informatics in Control, Automation and Robotics","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Heuristic Optimization for Dual-resource Constrained Job Shop Scheduling\",\"authors\":\"H. Ren, Lili Jiang, Xiaoying Xi, Muzhi Li\",\"doi\":\"10.1109/CAR.2009.113\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the study of job shop scheduling problem in mass injection molding processing enterprises, the practical job shop scheduling environment cannot be mirrored in the traditional study only considering machine resources. A dual-resource (machines and moulds) constrained job shop scheduling problem model was established in this paper, according to the actual factors of mass injection molding processing job shop scheduling. A heuristic active algorithm combined with priority rules is employed to give the solution. Finally, an example is made to illustrate the algorithm, whose schedule result is shown with a Gantt chart.\",\"PeriodicalId\":320307,\"journal\":{\"name\":\"2009 International Asia Conference on Informatics in Control, Automation and Robotics\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 International Asia Conference on Informatics in Control, Automation and Robotics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CAR.2009.113\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Asia Conference on Informatics in Control, Automation and Robotics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CAR.2009.113","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

在大规模注塑加工企业作业车间调度问题的研究中,仅考虑机器资源的传统研究无法反映实际作业车间调度环境。根据大批量注塑加工作业车间调度的实际因素,建立了一个双资源(机器和模具)约束的作业车间调度问题模型。采用一种结合优先级规则的启发式主动算法进行求解。最后通过一个算例对算法进行了说明,并以甘特图的形式给出了算法的调度结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Heuristic Optimization for Dual-resource Constrained Job Shop Scheduling
In the study of job shop scheduling problem in mass injection molding processing enterprises, the practical job shop scheduling environment cannot be mirrored in the traditional study only considering machine resources. A dual-resource (machines and moulds) constrained job shop scheduling problem model was established in this paper, according to the actual factors of mass injection molding processing job shop scheduling. A heuristic active algorithm combined with priority rules is employed to give the solution. Finally, an example is made to illustrate the algorithm, whose schedule result is shown with a Gantt chart.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信