钾矿开采规划采矿模拟模型的建立

A. Zatonskiy, P. A. Yazev
{"title":"钾矿开采规划采矿模拟模型的建立","authors":"A. Zatonskiy, P. A. Yazev","doi":"10.14529/ctcr200405","DOIUrl":null,"url":null,"abstract":"In this article, we show the importance of potash fertilizers produced by PJSC Uralkali, Berezniki, Perm Territory for agriculture and the economy in general. А process of potas¬sium ore underground mining is described from breaking up moment till transportation to the surface. An importance of production planning for the mining enterprise functioning is substantiated. Various levels of plan-ning, from a general production plan to a weekly and daily plans are described. The problem of such planning at PJSC Uralkali is in using only integral performance indicators, it leads to significant errors. It is proposed to use simulation modeling as a possible solution to the problem. Purpose of work. The purpose of this work is to develop a simulation model of mining operations, from the process of breaking and transporting ore to a conveyor-transport system, and to test model’s applicability for ore mining planning. Since the existing software has a number of limitations in applies to potash mines, a specialized object-oriented library allows modeling queuing systems, multi-agent and active systems is used as a basis for modeling. The limitations and as-sumptions of the model are described. Materials and methods. The model is igned as a determinis-tic automaton. The end point for ore mining process modeling is the transfer of ore to the unloading point, because further transportation of ore is not a limiting factor for mining. Conclusion. The spe-cial states of all objects of the system including mining combine – self-propelled car – unloading point and all possible transitions between them are described. A data from open sources is taken to check the adequacy of the model. Changes in the simulation results are investigated for various in-put parameters in the developed software. The simulation results are of a pulsating character due to the periodic execution of the harvester drive away. A productivity of the combine decreases with an increase in the distance traveled by a self-propelled car. The possibility of transition to a stochas-tic model is investigated. An expected decrease due to an increase in the downtime of the combine is shown. A conclusion about the applicability of the model to improve the quality of planning for un-derground potassium ore mining is made based on obtained data.","PeriodicalId":338904,"journal":{"name":"Bulletin of the South Ural State University. Ser. Computer Technologies, Automatic Control & Radioelectronics","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"DEVELOPMENT OF A MINING SIMULATION MODEL FOR POTASSIUM ORE MINING PLANNING\",\"authors\":\"A. Zatonskiy, P. A. Yazev\",\"doi\":\"10.14529/ctcr200405\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this article, we show the importance of potash fertilizers produced by PJSC Uralkali, Berezniki, Perm Territory for agriculture and the economy in general. А process of potas¬sium ore underground mining is described from breaking up moment till transportation to the surface. An importance of production planning for the mining enterprise functioning is substantiated. Various levels of plan-ning, from a general production plan to a weekly and daily plans are described. The problem of such planning at PJSC Uralkali is in using only integral performance indicators, it leads to significant errors. It is proposed to use simulation modeling as a possible solution to the problem. Purpose of work. The purpose of this work is to develop a simulation model of mining operations, from the process of breaking and transporting ore to a conveyor-transport system, and to test model’s applicability for ore mining planning. Since the existing software has a number of limitations in applies to potash mines, a specialized object-oriented library allows modeling queuing systems, multi-agent and active systems is used as a basis for modeling. The limitations and as-sumptions of the model are described. Materials and methods. The model is igned as a determinis-tic automaton. The end point for ore mining process modeling is the transfer of ore to the unloading point, because further transportation of ore is not a limiting factor for mining. Conclusion. The spe-cial states of all objects of the system including mining combine – self-propelled car – unloading point and all possible transitions between them are described. A data from open sources is taken to check the adequacy of the model. Changes in the simulation results are investigated for various in-put parameters in the developed software. The simulation results are of a pulsating character due to the periodic execution of the harvester drive away. A productivity of the combine decreases with an increase in the distance traveled by a self-propelled car. The possibility of transition to a stochas-tic model is investigated. An expected decrease due to an increase in the downtime of the combine is shown. A conclusion about the applicability of the model to improve the quality of planning for un-derground potassium ore mining is made based on obtained data.\",\"PeriodicalId\":338904,\"journal\":{\"name\":\"Bulletin of the South Ural State University. Ser. Computer Technologies, Automatic Control & Radioelectronics\",\"volume\":\"68 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the South Ural State University. Ser. Computer Technologies, Automatic Control & Radioelectronics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14529/ctcr200405\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the South Ural State University. Ser. Computer Technologies, Automatic Control & Radioelectronics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14529/ctcr200405","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在本文中,我们展示了PJSC乌拉尔、别列兹尼基、彼尔姆地区生产的钾肥对农业和总体经济的重要性。А叙述了地下开采钾矿从破碎时刻到运至地表的过程。论证了生产计划对矿山企业运作的重要性。不同层次的计划,从一般生产计划到周计划和日计划。这种规划在PJSC Uralkali的问题在于只使用整体绩效指标,它会导致重大错误。提出利用仿真建模作为解决这一问题的可能方法。工作目的。本工作的目的是建立一个采矿作业的模拟模型,从破碎和运输矿石到输送机运输系统的过程,并测试模型对采矿规划的适用性。由于现有的软件在应用于钾肥矿山方面存在许多局限性,因此一个专门的面向对象库允许对排队系统、多智能体和活动系统进行建模,并将其作为建模的基础。描述了模型的局限性和假设。材料和方法。该模型被设计为确定性自动机。矿石开采过程建模的终点是矿石转移到卸载点,因为矿石的进一步运输不是采矿的限制因素。结论。描述了系统中包括联合收割机-自行车-卸料点在内的所有对象的特殊状态,以及它们之间可能发生的过渡。从开放来源获取数据以检查模型的充分性。研究了所开发软件中不同输入参数对仿真结果的影响。由于收割机驱动装置的周期性运行,仿真结果具有脉动特征。联合收割机的生产效率随着自行式汽车行驶距离的增加而降低。研究了过渡到随机模型的可能性。由于联合收割机停机时间的增加,预计会减少。根据实测数据,得出了该模型对提高地下钾矿开采规划质量的适用性结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
DEVELOPMENT OF A MINING SIMULATION MODEL FOR POTASSIUM ORE MINING PLANNING
In this article, we show the importance of potash fertilizers produced by PJSC Uralkali, Berezniki, Perm Territory for agriculture and the economy in general. А process of potas¬sium ore underground mining is described from breaking up moment till transportation to the surface. An importance of production planning for the mining enterprise functioning is substantiated. Various levels of plan-ning, from a general production plan to a weekly and daily plans are described. The problem of such planning at PJSC Uralkali is in using only integral performance indicators, it leads to significant errors. It is proposed to use simulation modeling as a possible solution to the problem. Purpose of work. The purpose of this work is to develop a simulation model of mining operations, from the process of breaking and transporting ore to a conveyor-transport system, and to test model’s applicability for ore mining planning. Since the existing software has a number of limitations in applies to potash mines, a specialized object-oriented library allows modeling queuing systems, multi-agent and active systems is used as a basis for modeling. The limitations and as-sumptions of the model are described. Materials and methods. The model is igned as a determinis-tic automaton. The end point for ore mining process modeling is the transfer of ore to the unloading point, because further transportation of ore is not a limiting factor for mining. Conclusion. The spe-cial states of all objects of the system including mining combine – self-propelled car – unloading point and all possible transitions between them are described. A data from open sources is taken to check the adequacy of the model. Changes in the simulation results are investigated for various in-put parameters in the developed software. The simulation results are of a pulsating character due to the periodic execution of the harvester drive away. A productivity of the combine decreases with an increase in the distance traveled by a self-propelled car. The possibility of transition to a stochas-tic model is investigated. An expected decrease due to an increase in the downtime of the combine is shown. A conclusion about the applicability of the model to improve the quality of planning for un-derground potassium ore mining is made based on obtained data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信