{"title":"利用马尔可夫链法确定3准则参数下的备用变压器数量","authors":"M. Marbun, N. Sinisuka, N. Hariyanto","doi":"10.1109/PMAPS.2016.7764121","DOIUrl":null,"url":null,"abstract":"System failure cannot be avoided, one of the solutions to maintain system reliability is with the existence of spare equipment, and however the number of spare equipment will increase the investment costs. Currently, spare transformer calculation study only considers one criteria in state transition model, a new model which considers other criteria such as transformer condition and transformer loading is needed. Java Bali 500/150 kV Transformer case study was used in order to show the usefulness of the proposed model.","PeriodicalId":265474,"journal":{"name":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":"70 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The use of Markov chain method to determine spare transformer number with 3-criteria parameters\",\"authors\":\"M. Marbun, N. Sinisuka, N. Hariyanto\",\"doi\":\"10.1109/PMAPS.2016.7764121\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"System failure cannot be avoided, one of the solutions to maintain system reliability is with the existence of spare equipment, and however the number of spare equipment will increase the investment costs. Currently, spare transformer calculation study only considers one criteria in state transition model, a new model which considers other criteria such as transformer condition and transformer loading is needed. Java Bali 500/150 kV Transformer case study was used in order to show the usefulness of the proposed model.\",\"PeriodicalId\":265474,\"journal\":{\"name\":\"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"volume\":\"70 2\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PMAPS.2016.7764121\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS.2016.7764121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The use of Markov chain method to determine spare transformer number with 3-criteria parameters
System failure cannot be avoided, one of the solutions to maintain system reliability is with the existence of spare equipment, and however the number of spare equipment will increase the investment costs. Currently, spare transformer calculation study only considers one criteria in state transition model, a new model which considers other criteria such as transformer condition and transformer loading is needed. Java Bali 500/150 kV Transformer case study was used in order to show the usefulness of the proposed model.