基于实时性能数据的巴石竹水电站离岛运行建模与仿真

C. Dorji, Deependar Sharma, Yeshi Wangpo
{"title":"基于实时性能数据的巴石竹水电站离岛运行建模与仿真","authors":"C. Dorji, Deependar Sharma, Yeshi Wangpo","doi":"10.17102/bjrd.rub.11.1.025","DOIUrl":null,"url":null,"abstract":"This paper presents the dynamic modeling and simulation of the 64 MW Basochhu Hydro investigation of its island mode operation and network restoration. A robust real-time simulation model is necessary to analyze the static and dynamic control and operating characteristics of hydropower plant, which can be empirically modeled based on real-time performance measurements. The schematic layout of the BHP from the reservoir (pond) to the turbine is divided into sub-components, each of which is represented by mathematical differential-integral equations. The composite model was then validated by comparing the simulated and real-time measured responses. The paper also examined the preliminary test results of island mode operation and restoration to grid connection. The midnight load of Thimphu was arranged for island operation taking into account of the minimal power disruption. At the instant of grid disconnection, the active power of the test unit fell freely from 13 MW to 9 MW, activating the deflector control instantly cutting off the water jets proportional to the power drop. The measurements and simulation results confirmed that the Basochhu Hydropower Plant has robust governor control systems, and it can withstand the island mode operation, and reliably feed the local load without the need for grid interconnection.","PeriodicalId":244206,"journal":{"name":"Bhutan Journal of Research and Development","volume":"11 5","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modeling and Simulation of Basochhu Hydropower Plant: Islanding Operation Using Real-Time Performance Data\",\"authors\":\"C. Dorji, Deependar Sharma, Yeshi Wangpo\",\"doi\":\"10.17102/bjrd.rub.11.1.025\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the dynamic modeling and simulation of the 64 MW Basochhu Hydro investigation of its island mode operation and network restoration. A robust real-time simulation model is necessary to analyze the static and dynamic control and operating characteristics of hydropower plant, which can be empirically modeled based on real-time performance measurements. The schematic layout of the BHP from the reservoir (pond) to the turbine is divided into sub-components, each of which is represented by mathematical differential-integral equations. The composite model was then validated by comparing the simulated and real-time measured responses. The paper also examined the preliminary test results of island mode operation and restoration to grid connection. The midnight load of Thimphu was arranged for island operation taking into account of the minimal power disruption. At the instant of grid disconnection, the active power of the test unit fell freely from 13 MW to 9 MW, activating the deflector control instantly cutting off the water jets proportional to the power drop. The measurements and simulation results confirmed that the Basochhu Hydropower Plant has robust governor control systems, and it can withstand the island mode operation, and reliably feed the local load without the need for grid interconnection.\",\"PeriodicalId\":244206,\"journal\":{\"name\":\"Bhutan Journal of Research and Development\",\"volume\":\"11 5\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bhutan Journal of Research and Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17102/bjrd.rub.11.1.025\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bhutan Journal of Research and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17102/bjrd.rub.11.1.025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了64 MW巴舍胡水电站的动态建模与仿真,对其孤岛模式运行和电网恢复进行了研究。为了分析水电厂的静、动态控制和运行特性,需要一个鲁棒的实时仿真模型,该模型可以基于实时性能测量进行经验建模。从水库(池)到水轮机的BHP的原理图布局被划分为几个子部件,每个子部件用数学微分积分方程表示。然后通过比较模拟响应和实时测量响应来验证复合模型。并对孤岛模式运行和恢复并网的初步试验结果进行了分析。考虑到最小的电力中断,廷布的午夜负荷被安排为岛屿运行。在断网瞬间,试验机组的有功功率从13兆瓦自由下降到9兆瓦,启动偏转板控制,立即切断与功率下降成比例的水射流。实测和仿真结果表明,巴石竹水电站具有鲁棒的调速器控制系统,能够承受孤岛模式运行,在不需要并网的情况下可靠地馈电本地负荷。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modeling and Simulation of Basochhu Hydropower Plant: Islanding Operation Using Real-Time Performance Data
This paper presents the dynamic modeling and simulation of the 64 MW Basochhu Hydro investigation of its island mode operation and network restoration. A robust real-time simulation model is necessary to analyze the static and dynamic control and operating characteristics of hydropower plant, which can be empirically modeled based on real-time performance measurements. The schematic layout of the BHP from the reservoir (pond) to the turbine is divided into sub-components, each of which is represented by mathematical differential-integral equations. The composite model was then validated by comparing the simulated and real-time measured responses. The paper also examined the preliminary test results of island mode operation and restoration to grid connection. The midnight load of Thimphu was arranged for island operation taking into account of the minimal power disruption. At the instant of grid disconnection, the active power of the test unit fell freely from 13 MW to 9 MW, activating the deflector control instantly cutting off the water jets proportional to the power drop. The measurements and simulation results confirmed that the Basochhu Hydropower Plant has robust governor control systems, and it can withstand the island mode operation, and reliably feed the local load without the need for grid interconnection.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信