{"title":"通过混合LSTK合同减少ABEX的不确定性:东南亚工厂EPSm试点案例研究","authors":"S. A. Canny","doi":"10.2118/208621-ms","DOIUrl":null,"url":null,"abstract":"\n Well abandonment and the associated abandonment expenditure (ABEX) are necessary stages in the post cessation of production (Post COP) phase of the asset lifecycles. There are significant risk factors present, which vary in the frequency and severity based on a multitude of factors pertaining to environment, age, well construction techniques and stratigraphy, to name a few.\n In the case of well isolation and abandonment operations there are opportunities to innovate through factory project execution techniques and commercial approaches, which are enhanced where standardization and commonality of well architecture is present. These techniques focus on reducing risk factors and creating value where conventional thought suggests there is marginal cashflow benefit, in asset retirement obligation expenditure. Through a reduction in the total cost of ownership (TCO), project financial performance below the estimated provisions, can unlock cashflow from relief adjustments on long term liabilities.\n The Engineering, Procurement, Services management (EPSm) lump sum partial turnkey contracting approach was developed to assist operators in unlocking cashflow in ABEX provisions, through risk reduction via front end well engineering and integration of service provision, allied to fixed price lump sum contracting to control project cost creep due to unforeseen events.\n A pilot project was undertaken in South East Asia, delivering 64 permanently abandoned wellbores in 38 consecutive days, representing over 8,300-man hours and over 3,500 operating hours. The EPSm contracting approach delivered lump sum partial turnkey well abandonment services in a high-volume factory well abandonment retirement environment.\n Operations were executed through a dedicated jack-up drilling rig trimmed to an asset retirement specification to reduce OPEX and increase efficiency. The operational project framework implemented pre-abandonment offline operations prior to rig arrival, then simultaneous operations (SIMOPs) concerning 2 primary worksites: the wellhead platform weather deck and the jack-up rig cantilever. Standalone concurrent Phase I slickline operations comprising of two units, were performed offline on the wellhead platform with pressure control equipment to execute primary reservoir isolation operations. Phase II & III operations were executed above, on the jack-up rig cantilever through the drilling riser and pressure control equipment, executing the overburden and surface isolation operations, minimizing online operating time of the jack-up rig.\n Key Learnings from the pilot project are presented, along with pilot project key performance indicators. The project learning curve, and human performance factors provide insights to areas where there are synergies and opportunities to further reduce risk and the total cost of ownership through an Engineering, Procurement, Services management (EPSm) contracting approach.","PeriodicalId":335246,"journal":{"name":"Day 1 Tue, November 30, 2021","volume":"48 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reducing ABEX Uncertainties through Hybrid LSTK Contracting: A Factory EPSm Pilot Case Study in South East Asia\",\"authors\":\"S. A. Canny\",\"doi\":\"10.2118/208621-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Well abandonment and the associated abandonment expenditure (ABEX) are necessary stages in the post cessation of production (Post COP) phase of the asset lifecycles. There are significant risk factors present, which vary in the frequency and severity based on a multitude of factors pertaining to environment, age, well construction techniques and stratigraphy, to name a few.\\n In the case of well isolation and abandonment operations there are opportunities to innovate through factory project execution techniques and commercial approaches, which are enhanced where standardization and commonality of well architecture is present. These techniques focus on reducing risk factors and creating value where conventional thought suggests there is marginal cashflow benefit, in asset retirement obligation expenditure. Through a reduction in the total cost of ownership (TCO), project financial performance below the estimated provisions, can unlock cashflow from relief adjustments on long term liabilities.\\n The Engineering, Procurement, Services management (EPSm) lump sum partial turnkey contracting approach was developed to assist operators in unlocking cashflow in ABEX provisions, through risk reduction via front end well engineering and integration of service provision, allied to fixed price lump sum contracting to control project cost creep due to unforeseen events.\\n A pilot project was undertaken in South East Asia, delivering 64 permanently abandoned wellbores in 38 consecutive days, representing over 8,300-man hours and over 3,500 operating hours. The EPSm contracting approach delivered lump sum partial turnkey well abandonment services in a high-volume factory well abandonment retirement environment.\\n Operations were executed through a dedicated jack-up drilling rig trimmed to an asset retirement specification to reduce OPEX and increase efficiency. The operational project framework implemented pre-abandonment offline operations prior to rig arrival, then simultaneous operations (SIMOPs) concerning 2 primary worksites: the wellhead platform weather deck and the jack-up rig cantilever. Standalone concurrent Phase I slickline operations comprising of two units, were performed offline on the wellhead platform with pressure control equipment to execute primary reservoir isolation operations. Phase II & III operations were executed above, on the jack-up rig cantilever through the drilling riser and pressure control equipment, executing the overburden and surface isolation operations, minimizing online operating time of the jack-up rig.\\n Key Learnings from the pilot project are presented, along with pilot project key performance indicators. The project learning curve, and human performance factors provide insights to areas where there are synergies and opportunities to further reduce risk and the total cost of ownership through an Engineering, Procurement, Services management (EPSm) contracting approach.\",\"PeriodicalId\":335246,\"journal\":{\"name\":\"Day 1 Tue, November 30, 2021\",\"volume\":\"48 2\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, November 30, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/208621-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, November 30, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208621-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

弃井和相关弃井支出(ABEX)是资产生命周期中停产后(post COP)阶段的必要阶段。存在显著的风险因素,其频率和严重程度因环境、年龄、造井技术和地层等多种因素而异。在井隔离和弃井作业中,有机会通过工厂项目执行技术和商业方法进行创新,在井结构标准化和通用性的情况下,这些技术得到了加强。这些技术侧重于降低风险因素,并在传统思想认为存在边际现金流效益的地方创造价值,即资产退休义务支出。通过减少总拥有成本(TCO),项目财务业绩低于估计的规定,可以从长期负债的救济调整中释放现金流。开发了工程、采购、服务管理(EPSm)一次性总包部分交钥匙承包方法,通过前端井工程和集成服务提供来降低风险,结合固定价格一次性承包来控制由于不可预见事件导致的项目成本蠕变,从而帮助运营商在ABEX条款下释放现金流。在东南亚进行了一个试点项目,在连续38天内交付了64口永久废弃井,共计8300多个工时和3500多个作业小时。EPSm承包方式在大批量工厂弃井退役环境中提供了一次性部分交钥匙弃井服务。作业通过专用自升式钻井平台执行,该平台按照资产退役规范进行了修整,以降低运营成本并提高效率。作业项目框架在钻机到达之前实施了预弃井离线作业,然后在两个主要工作地点进行同步作业(SIMOPs):井口平台气象甲板和自升式钻机悬臂。第一阶段的钢丝绳作业由两个单元组成,在井口平台上进行离线作业,使用压力控制设备执行初级油藏隔离作业。第二期和第三期作业在自升式钻井平台上通过钻井隔水管和压力控制设备进行悬臂作业,执行覆盖层和地面隔离作业,最大限度地减少了自升式钻井平台的在线作业时间。介绍了试点项目的主要经验教训,以及试点项目的关键绩效指标。项目学习曲线和人员绩效因素为通过工程、采购、服务管理(EPSm)合同方法进一步降低风险和总拥有成本提供了协同效应和机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reducing ABEX Uncertainties through Hybrid LSTK Contracting: A Factory EPSm Pilot Case Study in South East Asia
Well abandonment and the associated abandonment expenditure (ABEX) are necessary stages in the post cessation of production (Post COP) phase of the asset lifecycles. There are significant risk factors present, which vary in the frequency and severity based on a multitude of factors pertaining to environment, age, well construction techniques and stratigraphy, to name a few. In the case of well isolation and abandonment operations there are opportunities to innovate through factory project execution techniques and commercial approaches, which are enhanced where standardization and commonality of well architecture is present. These techniques focus on reducing risk factors and creating value where conventional thought suggests there is marginal cashflow benefit, in asset retirement obligation expenditure. Through a reduction in the total cost of ownership (TCO), project financial performance below the estimated provisions, can unlock cashflow from relief adjustments on long term liabilities. The Engineering, Procurement, Services management (EPSm) lump sum partial turnkey contracting approach was developed to assist operators in unlocking cashflow in ABEX provisions, through risk reduction via front end well engineering and integration of service provision, allied to fixed price lump sum contracting to control project cost creep due to unforeseen events. A pilot project was undertaken in South East Asia, delivering 64 permanently abandoned wellbores in 38 consecutive days, representing over 8,300-man hours and over 3,500 operating hours. The EPSm contracting approach delivered lump sum partial turnkey well abandonment services in a high-volume factory well abandonment retirement environment. Operations were executed through a dedicated jack-up drilling rig trimmed to an asset retirement specification to reduce OPEX and increase efficiency. The operational project framework implemented pre-abandonment offline operations prior to rig arrival, then simultaneous operations (SIMOPs) concerning 2 primary worksites: the wellhead platform weather deck and the jack-up rig cantilever. Standalone concurrent Phase I slickline operations comprising of two units, were performed offline on the wellhead platform with pressure control equipment to execute primary reservoir isolation operations. Phase II & III operations were executed above, on the jack-up rig cantilever through the drilling riser and pressure control equipment, executing the overburden and surface isolation operations, minimizing online operating time of the jack-up rig. Key Learnings from the pilot project are presented, along with pilot project key performance indicators. The project learning curve, and human performance factors provide insights to areas where there are synergies and opportunities to further reduce risk and the total cost of ownership through an Engineering, Procurement, Services management (EPSm) contracting approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信