施工现场设计规划采用4D BIM建模

Caroline Wilsek Caldart, S. Scheer
{"title":"施工现场设计规划采用4D BIM建模","authors":"Caroline Wilsek Caldart, S. Scheer","doi":"10.1590/1806-9649-2022v29e5312","DOIUrl":null,"url":null,"abstract":"Abstract: Adequate construction site planning provides productivity and safety gains and reduces material transportation costs. However, as they take a dynamic structure, the construction site layout planning is quite often complex and inefficient. 4D BIM modeling helps to visualize the spatial layout of objects on the construction site throughout the project establishing their positioning during a specific time, thus providing better results for the physical use of space. By using the Design Science Research method, this article aims to establish a process using 4D BIM modeling to implement the planning and management of construction sites taking into account their key characteristic, dynamism.","PeriodicalId":146264,"journal":{"name":"Gestão & Produção","volume":"176 7","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Construction site design planning using 4D BIM modeling\",\"authors\":\"Caroline Wilsek Caldart, S. Scheer\",\"doi\":\"10.1590/1806-9649-2022v29e5312\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract: Adequate construction site planning provides productivity and safety gains and reduces material transportation costs. However, as they take a dynamic structure, the construction site layout planning is quite often complex and inefficient. 4D BIM modeling helps to visualize the spatial layout of objects on the construction site throughout the project establishing their positioning during a specific time, thus providing better results for the physical use of space. By using the Design Science Research method, this article aims to establish a process using 4D BIM modeling to implement the planning and management of construction sites taking into account their key characteristic, dynamism.\",\"PeriodicalId\":146264,\"journal\":{\"name\":\"Gestão & Produção\",\"volume\":\"176 7\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gestão & Produção\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1590/1806-9649-2022v29e5312\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gestão & Produção","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/1806-9649-2022v29e5312","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

摘要:充分的施工现场规划可以提高生产率和安全性,降低材料运输成本。然而,由于它们采取动态结构,施工现场布局规划往往复杂而低效。4D BIM建模有助于可视化整个项目施工现场物体的空间布局,确定其在特定时间的定位,从而为空间的物理利用提供更好的效果。本文运用Design Science Research的方法,针对建筑工地的关键特征——动态性,建立一个利用4D BIM建模实现建筑工地规划与管理的流程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Construction site design planning using 4D BIM modeling
Abstract: Adequate construction site planning provides productivity and safety gains and reduces material transportation costs. However, as they take a dynamic structure, the construction site layout planning is quite often complex and inefficient. 4D BIM modeling helps to visualize the spatial layout of objects on the construction site throughout the project establishing their positioning during a specific time, thus providing better results for the physical use of space. By using the Design Science Research method, this article aims to establish a process using 4D BIM modeling to implement the planning and management of construction sites taking into account their key characteristic, dynamism.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信