{"title":"比较模型生成与专家生成的IV&V活动计划","authors":"H. Nakao, S. Yoshikawa, D. Port, Yuko Miyamoto, M. Katahira","doi":"10.1109/ESEM.2007.75","DOIUrl":null,"url":null,"abstract":"An IV&V activity plan describes what assurance activities to perform, where to do them, when, and to what extent. Meaningful justification for an IV&V budget and evidence that activities performed actually provide high assurance has been difficult to provide from plans created (generally ad hoc) by experts. JAXA now uses the \"strategic IV&V planning and cost model\" to addresses these issues and complement expert planning activities. This research presents a grounded empirical study that compares plans generated by the strategic model to those created by experts on several past IV&V projects. Through this research, we found that the model generated plan typically is a superset of the experts ' plan. We found that experts tended to follow the most cost-effective route but had a bias in their particular activity selections. Ultimately we found increased confidence in both expert and model based planning and now have new tools for assessing and improving them.","PeriodicalId":124420,"journal":{"name":"First International Symposium on Empirical Software Engineering and Measurement (ESEM 2007)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Comparing Model Generated with Expert Generated IV&V Activity Plans\",\"authors\":\"H. Nakao, S. Yoshikawa, D. Port, Yuko Miyamoto, M. Katahira\",\"doi\":\"10.1109/ESEM.2007.75\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An IV&V activity plan describes what assurance activities to perform, where to do them, when, and to what extent. Meaningful justification for an IV&V budget and evidence that activities performed actually provide high assurance has been difficult to provide from plans created (generally ad hoc) by experts. JAXA now uses the \\\"strategic IV&V planning and cost model\\\" to addresses these issues and complement expert planning activities. This research presents a grounded empirical study that compares plans generated by the strategic model to those created by experts on several past IV&V projects. Through this research, we found that the model generated plan typically is a superset of the experts ' plan. We found that experts tended to follow the most cost-effective route but had a bias in their particular activity selections. Ultimately we found increased confidence in both expert and model based planning and now have new tools for assessing and improving them.\",\"PeriodicalId\":124420,\"journal\":{\"name\":\"First International Symposium on Empirical Software Engineering and Measurement (ESEM 2007)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"First International Symposium on Empirical Software Engineering and Measurement (ESEM 2007)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ESEM.2007.75\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"First International Symposium on Empirical Software Engineering and Measurement (ESEM 2007)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESEM.2007.75","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Comparing Model Generated with Expert Generated IV&V Activity Plans
An IV&V activity plan describes what assurance activities to perform, where to do them, when, and to what extent. Meaningful justification for an IV&V budget and evidence that activities performed actually provide high assurance has been difficult to provide from plans created (generally ad hoc) by experts. JAXA now uses the "strategic IV&V planning and cost model" to addresses these issues and complement expert planning activities. This research presents a grounded empirical study that compares plans generated by the strategic model to those created by experts on several past IV&V projects. Through this research, we found that the model generated plan typically is a superset of the experts ' plan. We found that experts tended to follow the most cost-effective route but had a bias in their particular activity selections. Ultimately we found increased confidence in both expert and model based planning and now have new tools for assessing and improving them.