基于层次分析法的设计阶段人为错误概率估计模型

Ung-Kyun Lee
{"title":"基于层次分析法的设计阶段人为错误概率估计模型","authors":"Ung-Kyun Lee","doi":"10.3311/ccc2019-028","DOIUrl":null,"url":null,"abstract":"The building information modeling (BIM) technique is used widely in construction. In general, BIM can prevent interference between different types of construction activities in advance, thereby reducing the cost of reconstruction. While it is clear that a decrease in the number of requests for information in the construction stage would have obvious benefits, there is a need to determine the effects of the investment from the planning stage. Therefore, in this study, a procedure for quantifying the design errors that occur at the design stage is proposed considering the probability of the human errors concept. To achieve this, factors for evaluating human errors can arise during the drawing stage. Based on these factors, an analytic-hierarchy-process-based human error probability estimation model is suggested. Based on the factors affecting the error in the design stage, we construct a hierarchy and calculate the relative importance based on the probability and assess the effectiveness of each risk control option. It is expected that if the model presented in this study is linked with the loss cost data for each factor, a loss estimation model at the design stage can be developed. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"256 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analytic Hierarchy Process-Based Model for Estimating Probability of Human Error in Design Stage\",\"authors\":\"Ung-Kyun Lee\",\"doi\":\"10.3311/ccc2019-028\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The building information modeling (BIM) technique is used widely in construction. In general, BIM can prevent interference between different types of construction activities in advance, thereby reducing the cost of reconstruction. While it is clear that a decrease in the number of requests for information in the construction stage would have obvious benefits, there is a need to determine the effects of the investment from the planning stage. Therefore, in this study, a procedure for quantifying the design errors that occur at the design stage is proposed considering the probability of the human errors concept. To achieve this, factors for evaluating human errors can arise during the drawing stage. Based on these factors, an analytic-hierarchy-process-based human error probability estimation model is suggested. Based on the factors affecting the error in the design stage, we construct a hierarchy and calculate the relative importance based on the probability and assess the effectiveness of each risk control option. It is expected that if the model presented in this study is linked with the loss cost data for each factor, a loss estimation model at the design stage can be developed. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.\",\"PeriodicalId\":231420,\"journal\":{\"name\":\"Proceedings of the Creative Construction Conference 2019\",\"volume\":\"256 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Creative Construction Conference 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3311/ccc2019-028\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-028","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建筑信息模型(BIM)技术在建筑施工中得到了广泛的应用。一般来说,BIM可以提前防止不同类型的施工活动之间的干扰,从而降低重建成本。虽然在建设阶段减少索取资料的次数显然会有明显的好处,但有必要从规划阶段就确定投资的效果。因此,在本研究中,考虑到人为错误概念的概率,提出了一种量化在设计阶段发生的设计错误的程序。为了实现这一点,在绘图阶段可能会出现评估人为错误的因素。基于这些因素,提出了一种基于层次分析法的人为错误概率估计模型。根据设计阶段影响误差的因素,构建层次结构,并基于概率计算各风险控制方案的相对重要性,评估各风险控制方案的有效性。如果将本研究提出的模型与各因素的损失成本数据联系起来,可以建立设计阶段的损失估计模型。©2019作者。由布达佩斯科技经济大学和钻石大会有限公司出版。由2019创意建设大会科学委员会负责同行评审。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analytic Hierarchy Process-Based Model for Estimating Probability of Human Error in Design Stage
The building information modeling (BIM) technique is used widely in construction. In general, BIM can prevent interference between different types of construction activities in advance, thereby reducing the cost of reconstruction. While it is clear that a decrease in the number of requests for information in the construction stage would have obvious benefits, there is a need to determine the effects of the investment from the planning stage. Therefore, in this study, a procedure for quantifying the design errors that occur at the design stage is proposed considering the probability of the human errors concept. To achieve this, factors for evaluating human errors can arise during the drawing stage. Based on these factors, an analytic-hierarchy-process-based human error probability estimation model is suggested. Based on the factors affecting the error in the design stage, we construct a hierarchy and calculate the relative importance based on the probability and assess the effectiveness of each risk control option. It is expected that if the model presented in this study is linked with the loss cost data for each factor, a loss estimation model at the design stage can be developed. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信