并网风电场电力系统电池储能系统研究进展

Evando Diotama, Lesnanto Multa Putranto, S. Sarjiya, R. Irnawan
{"title":"并网风电场电力系统电池储能系统研究进展","authors":"Evando Diotama, Lesnanto Multa Putranto, S. Sarjiya, R. Irnawan","doi":"10.1109/ICST50505.2020.9732801","DOIUrl":null,"url":null,"abstract":"Wind power has massive potency to be developed, by the fact that wind resource is more environmentally friendly than conventional non-renewable resources. However, wind power generation tends to unstable due to its intermittency. The installation of BESS (Battery Energy Storage System) on the power system which utilizes wind resource may overcome this intermittency problem. In this paper, a review on placement and sizing optimization of BESS in power system with wind farm integration has presented. The comparison of various methods indicates that placement and sizing optimization of BESS can reduce the loss. Hence the better stability can be obtained.","PeriodicalId":125807,"journal":{"name":"2020 6th International Conference on Science and Technology (ICST)","volume":"11 14","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Review on Battery Energy Storage System for Power System with Grid Connected Wind Farm\",\"authors\":\"Evando Diotama, Lesnanto Multa Putranto, S. Sarjiya, R. Irnawan\",\"doi\":\"10.1109/ICST50505.2020.9732801\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Wind power has massive potency to be developed, by the fact that wind resource is more environmentally friendly than conventional non-renewable resources. However, wind power generation tends to unstable due to its intermittency. The installation of BESS (Battery Energy Storage System) on the power system which utilizes wind resource may overcome this intermittency problem. In this paper, a review on placement and sizing optimization of BESS in power system with wind farm integration has presented. The comparison of various methods indicates that placement and sizing optimization of BESS can reduce the loss. Hence the better stability can be obtained.\",\"PeriodicalId\":125807,\"journal\":{\"name\":\"2020 6th International Conference on Science and Technology (ICST)\",\"volume\":\"11 14\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 6th International Conference on Science and Technology (ICST)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICST50505.2020.9732801\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 6th International Conference on Science and Technology (ICST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICST50505.2020.9732801","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

风力资源比传统的不可再生资源更环保,因此风力发电有巨大的潜力有待开发。然而,风力发电因其间歇性而趋于不稳定。在利用风力资源的电力系统上安装BESS(电池储能系统)可以克服这一间歇性问题。本文综述了风电场集成电力系统中BESS的布局和尺寸优化问题。各种方法的比较表明,优化BESS的布局和尺寸可以减少损耗。因此可以获得较好的稳定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Review on Battery Energy Storage System for Power System with Grid Connected Wind Farm
Wind power has massive potency to be developed, by the fact that wind resource is more environmentally friendly than conventional non-renewable resources. However, wind power generation tends to unstable due to its intermittency. The installation of BESS (Battery Energy Storage System) on the power system which utilizes wind resource may overcome this intermittency problem. In this paper, a review on placement and sizing optimization of BESS in power system with wind farm integration has presented. The comparison of various methods indicates that placement and sizing optimization of BESS can reduce the loss. Hence the better stability can be obtained.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信