Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions.

IF 1 Q3 PUBLIC ADMINISTRATION
Public Works Management & Policy Pub Date : 2023-07-01 Epub Date: 2022-07-07 DOI:10.1177/1087724X221113579
Rasha A Waheeb, Kusay A Wheib, Bjørn S Andersen, Rafea Al-Suhiili
{"title":"Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions.","authors":"Rasha A Waheeb,&nbsp;Kusay A Wheib,&nbsp;Bjørn S Andersen,&nbsp;Rafea Al-Suhiili","doi":"10.1177/1087724X221113579","DOIUrl":null,"url":null,"abstract":"<p><p>This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a lack of good project risk management skills and remote project management capability which is exacerbated by shortfalls in technical development and information technology.</p>","PeriodicalId":45483,"journal":{"name":"Public Works Management & Policy","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2023-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ftp.ncbi.nlm.nih.gov/pub/pmc/oa_pdf/f3/9c/10.1177_1087724X221113579.PMC9264380.pdf","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Public Works Management & Policy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/1087724X221113579","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2022/7/7 0:00:00","PubModel":"Epub","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 7

Abstract

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a lack of good project risk management skills and remote project management capability which is exacerbated by shortfalls in technical development and information technology.

Abstract Image

Abstract Image

Abstract Image

新冠肺炎疫情对不同建设项目管理的影响:问题与对策。
本研究讨论了从中东国家特别是伊拉克选出的36个不同类型和规模的工程项目中因流行病相关(新冠肺炎)暂停而导致的风险管理策略。主要的数据收集方法是由选定的项目工作人员和劳工完成的调查和问卷调查。数据使用Microsoft Excel进行处理,以构建模型,帮助决策者找到解决疫情期间可能出现的日程安排问题的方案。提出了一个项目风险管理的理论和实践概念,解决了影响进度和成本的一系列全球和地方问题,结果表明,最严重的延误是由于缺乏良好的项目风险管理技能和远程项目管理能力,而技术开发和信息技术的不足又加剧了这种情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Public Works Management & Policy
Public Works Management & Policy PUBLIC ADMINISTRATION-
CiteScore
2.00
自引率
7.10%
发文量
41
期刊介绍: PUBLIC WORKS MANAGEMENT & POLICY: RESEARCH AND PRACTICE IN TRANSPORTATION, INFRASTRUCTURE, AND THE ENVIRONMENT is a peer-reviewed journal for academics and practitioners in public works and the public and private infrastructure industries. This journal addresses the planning, financing, development, and operations of civil infrastructure systems at all levels of society— from federal policy to the demand for, and delivery of, state and local public works services. PWMP solicits manuscripts that convey research results, evaluate management innovations, suggest methods of analysis and evaluation, and examine policy issues.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信