Multivariate 3D Static and Dynamic Modeling Approach for an Oil Field at Early Stages of Exploration for a Fast-Track Project

V. Litvin, A. Potapov, M. Snachev
{"title":"Multivariate 3D Static and Dynamic Modeling Approach for an Oil Field at Early Stages of Exploration for a Fast-Track Project","authors":"V. Litvin, A. Potapov, M. Snachev","doi":"10.2118/196642-ms","DOIUrl":null,"url":null,"abstract":"\n In this paper, the approach to multivariate static and dynamic modeling is considered on the example of an offshore field discovered in 2017. Based on the limited volume of information, the quantitative and qualitative description of uncertainties included further in the 3D modeling is made. This model is proposed to be used as a tool for prompt decision making when implementing a fast-track project with limited time between exploration and pre-FEED stages.","PeriodicalId":11098,"journal":{"name":"Day 2 Wed, September 18, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 18, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/196642-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In this paper, the approach to multivariate static and dynamic modeling is considered on the example of an offshore field discovered in 2017. Based on the limited volume of information, the quantitative and qualitative description of uncertainties included further in the 3D modeling is made. This model is proposed to be used as a tool for prompt decision making when implementing a fast-track project with limited time between exploration and pre-FEED stages.
某油田快速通道项目勘探初期多变量三维静态与动态建模方法
本文以2017年发现的海上油田为例,研究了多元静态和动态建模方法。基于有限的信息量,对三维建模中进一步包含的不确定性进行了定量和定性描述。该模型建议在实施快速通道项目时,在勘探和预feed阶段之间的时间有限的情况下,作为快速决策的工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信