{"title":"IMPLEMENTASI METODE EOQ (ECONOMICAL ORDER QUANTITY) PADA SYSTEM INVENTORY DI PERUSAHAAN X","authors":"Khairul Ihwan","doi":"10.32520/jupel.v5i1.2529","DOIUrl":null,"url":null,"abstract":"In the industrial world, determining the amount of raw material inventory is an important issue, because raw material inventory has a direct effect on the course of production. Errors in determining inventory can paralyze all production activities, because raw materials are the initial materials or media in the production process. If the raw material inventory is too large compared to the company's needs, it will add to the burden on maintenance and storage costs in the warehouse, as well as the possibility of depreciation and a decrease in the quality of raw materials, so this will greatly affect the cost of raw material inventory. And vice versa, if the inventory is too small it will result in a bottleneck in production. Based on the description above, the researcher conducted research at a workshop company in X city. The object of the study was to calculate the cost of procuring AWS welding wire raw materials at the company using the EOQ method. The results showed that the raw material requirement for AWS welding wire in period 9 could be known economically, namely = 77.9817 kg for AWS welding wire. Purchase frequency for AWS welding wire 11 times. The total cost of TIC supplies in period 9 for AWS welding wire = IDR 7,800.00/Kg. To determine the number of orders and the right time to order is when inventory is at point 34.30099 Kg with a reorder amount of 77.9817 kg for AWS welding wire.","PeriodicalId":33961,"journal":{"name":"Jurnal Informatika dan Rekayasa Perangkat Lunak","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Informatika dan Rekayasa Perangkat Lunak","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32520/jupel.v5i1.2529","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the industrial world, determining the amount of raw material inventory is an important issue, because raw material inventory has a direct effect on the course of production. Errors in determining inventory can paralyze all production activities, because raw materials are the initial materials or media in the production process. If the raw material inventory is too large compared to the company's needs, it will add to the burden on maintenance and storage costs in the warehouse, as well as the possibility of depreciation and a decrease in the quality of raw materials, so this will greatly affect the cost of raw material inventory. And vice versa, if the inventory is too small it will result in a bottleneck in production. Based on the description above, the researcher conducted research at a workshop company in X city. The object of the study was to calculate the cost of procuring AWS welding wire raw materials at the company using the EOQ method. The results showed that the raw material requirement for AWS welding wire in period 9 could be known economically, namely = 77.9817 kg for AWS welding wire. Purchase frequency for AWS welding wire 11 times. The total cost of TIC supplies in period 9 for AWS welding wire = IDR 7,800.00/Kg. To determine the number of orders and the right time to order is when inventory is at point 34.30099 Kg with a reorder amount of 77.9817 kg for AWS welding wire.
在X公司的系统清单上执行EOQ方法(经济订单配额)
在工业领域,确定原材料库存的数量是一个重要的问题,因为原材料库存对生产过程有直接影响。由于原材料是生产过程中的初始材料或媒介,因此确定库存的错误会使所有生产活动瘫痪。如果原材料库存与公司的需求相比过大,则会增加仓库维护和储存成本的负担,并且有可能出现原材料的折旧和质量下降,因此这将大大影响原材料库存的成本。反之亦然,如果库存太少,就会造成生产的瓶颈。基于以上描述,研究者在X市的一家车间公司进行了调研。本研究的目的是利用EOQ法计算公司采购AWS焊丝原材料的成本。结果表明,第9期对AWS焊丝的原料需求量为77.9817 kg,经济上是已知的。AWS焊丝采购频率11次。第9期TIC供应AWS焊丝的总成本= 7,800.00印尼盾/千克。要确定订单数量和正确的订购时间是当库存为34.30099 Kg, AWS焊丝的再订货量为77.9817 Kg时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信