STUDI KELAYAKAN EKONOMI PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI SUNGAI YEH DIKIS BANJAR LEBAH KABUPATEN TABANAN

Kadek Dwi Damarian, I. Ayu, Dwi Giriantari, I. Jati
{"title":"STUDI KELAYAKAN EKONOMI PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI SUNGAI YEH DIKIS BANJAR LEBAH KABUPATEN TABANAN","authors":"Kadek Dwi Damarian, I. Ayu, Dwi Giriantari, I. Jati","doi":"10.24843/spektrum.2023.v10.i02.p4","DOIUrl":null,"url":null,"abstract":"Micro-hydro Power Plant (MHPP) is a small-scale power plant that uses hydroelectric power as its driving force, such as irrigation canals, rivers or natural waterfalls using the height of the waterfall (head) and the amount of water discharge. Yeh Dikis River, Banjar Lebah, Tabanan Regency is a supporting location for the construction of a Micro Hydro Power Plant (MHPP) which is useful in planning tourism development around the river. The results of measurements and calculations of the current are 0.381 m3/s with a head of 8.2 m. Through the analysis and calculation results, a crossflow turbine with a capacity of 18.15 kW is obtained. The generator used is an alternator with a rotational speed of 1500 rpm. The energy potential that can be generated with a turbine efficiency of 0.75 and a generator efficiency of 0.9 is 15,516 kW. The investment cost to build a PLTMH located on the Yeh Dikis River, Banjar Lebah Tabanan Bali is IDR 372,593,629. The NPV discount rate used is 10% and 12%, the value becomes IDR 305,254,944.69 and IDR 241,046,517.53. IRR is 37.8% and 46.0%, BCR is 0.82 and 0.65; BEP per unit is obtained by selling 1,284,609 kWh of energy. The construction of a MHPP on the Yeh Dikis River, Banjar Lebah, Tabanan, Bali is said to be feasible and capable of obtaining a return on capital in at least 5 years.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"22 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i02.p4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Micro-hydro Power Plant (MHPP) is a small-scale power plant that uses hydroelectric power as its driving force, such as irrigation canals, rivers or natural waterfalls using the height of the waterfall (head) and the amount of water discharge. Yeh Dikis River, Banjar Lebah, Tabanan Regency is a supporting location for the construction of a Micro Hydro Power Plant (MHPP) which is useful in planning tourism development around the river. The results of measurements and calculations of the current are 0.381 m3/s with a head of 8.2 m. Through the analysis and calculation results, a crossflow turbine with a capacity of 18.15 kW is obtained. The generator used is an alternator with a rotational speed of 1500 rpm. The energy potential that can be generated with a turbine efficiency of 0.75 and a generator efficiency of 0.9 is 15,516 kW. The investment cost to build a PLTMH located on the Yeh Dikis River, Banjar Lebah Tabanan Bali is IDR 372,593,629. The NPV discount rate used is 10% and 12%, the value becomes IDR 305,254,944.69 and IDR 241,046,517.53. IRR is 37.8% and 46.0%, BCR is 0.82 and 0.65; BEP per unit is obtained by selling 1,284,609 kWh of energy. The construction of a MHPP on the Yeh Dikis River, Banjar Lebah, Tabanan, Bali is said to be feasible and capable of obtaining a return on capital in at least 5 years.
微型水力发电厂(MHPP)是一种利用水力作为动力的小型发电厂,如灌溉渠道、河流或天然瀑布,利用瀑布的高度(水头)和排水量。塔巴南省班贾尔勒巴的Yeh Dikis河是建设微型水力发电厂(MHPP)的辅助地点,这对规划河周围的旅游发展很有用。测量计算结果为0.381 m3/s,水头8.2 m。通过分析计算结果,得到了一台容量为18.15 kW的横流式水轮机。所使用的发电机是一台转速为1500转/分的交流发电机。当水轮机效率为0.75,发电机效率为0.9时,可产生的能量潜力为15,516 kW。在Banjar Lebah Tabanan Bali的Yeh Dikis河上建造PLTMH的投资成本为372,593,629印尼盾。使用的净现值贴现率为10%和12%,其价值为305,254,944.69印尼盾和241,046,517.53印尼盾。IRR分别为37.8%和46.0%,BCR分别为0.82和0.65;每单位的BEP是通过销售1,284,609千瓦时的能源获得的。在巴厘岛Tabanan的Banjar Lebah的Yeh Dikis河上建设MHPP据说是可行的,并且能够在至少5年内获得资本回报。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信