ANALISIS RISIKO TERHADAP WAKTU DAN BIAYA PADA STRUKTUR BAWAH PROYEK PEMBANGUNAN GEDUNG KEJAKSAAN TINGGI JAKARTA

Abdul Fakar Hidayat Naypon, Hikma Dewita
{"title":"ANALISIS RISIKO TERHADAP WAKTU DAN BIAYA PADA STRUKTUR BAWAH PROYEK PEMBANGUNAN GEDUNG KEJAKSAAN TINGGI JAKARTA","authors":"Abdul Fakar Hidayat Naypon, Hikma Dewita","doi":"10.30736/jt.v14i2.903","DOIUrl":null,"url":null,"abstract":"The implementation of construction project work cannot be separated from the possibility of a risk occurring, the risk can also be detrimental and have an impact on project achievement, as well as the Jakarta High Prosecutor's Office Building project. This study aims to determine the risk factors, the level of risk and the dominant risk in the work of the lower structure of the construction project. The data was processed using the Analytic Hierarchy Process (AHP) method to obtain the risk weight and then analyzed. The results of the analysis are obtained, there are 34 relevant risks, from the 34 relevant risks, 6 dominant risks are obtained and those that have an impact on costs, these risks are Landslides, Inaccurate soil data, Error in determining point and foundation dimensions, Error marking, Productivity Labor does not match estimates, Weak time control system. Meanwhile, the dominant risks and those that have an impact on time are 9 risks, namely Rain, Marking errors, Errors in assembling formwork, Labor productivity not as expected, Low tool productivity, Delays in ordering equipment, Damage to tools, Weak time control system, Absence time control information to monitor and analyze schedule estimation errors that affect project performance. ","PeriodicalId":17707,"journal":{"name":"Jurnal Qua Teknika","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Qua Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/jt.v14i2.903","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The implementation of construction project work cannot be separated from the possibility of a risk occurring, the risk can also be detrimental and have an impact on project achievement, as well as the Jakarta High Prosecutor's Office Building project. This study aims to determine the risk factors, the level of risk and the dominant risk in the work of the lower structure of the construction project. The data was processed using the Analytic Hierarchy Process (AHP) method to obtain the risk weight and then analyzed. The results of the analysis are obtained, there are 34 relevant risks, from the 34 relevant risks, 6 dominant risks are obtained and those that have an impact on costs, these risks are Landslides, Inaccurate soil data, Error in determining point and foundation dimensions, Error marking, Productivity Labor does not match estimates, Weak time control system. Meanwhile, the dominant risks and those that have an impact on time are 9 risks, namely Rain, Marking errors, Errors in assembling formwork, Labor productivity not as expected, Low tool productivity, Delays in ordering equipment, Damage to tools, Weak time control system, Absence time control information to monitor and analyze schedule estimation errors that affect project performance. 
分析雅加达检察官大楼建设项目的时间和成本成本
建筑项目工作的实施离不开发生风险的可能性,风险也可能是有害的,并对项目成果产生影响,雅加达高级检察官办公室大楼项目也是如此。本研究旨在确定建设项目下部结构工作中的风险因素、风险水平和主导风险。采用层次分析法(AHP)对数据进行处理,得到风险权重并进行分析。分析结果表明,有34个相关风险,从34个相关风险中,得出6个主要风险和对成本有影响的风险,这些风险是滑坡,土壤数据不准确,确定点和基础尺寸错误,标记错误,生产力劳动不匹配估算,时间控制系统薄弱。同时,主要风险和对时间有影响的风险是9个风险,即下雨、打标错误、模板装配错误、劳动生产率低于预期、工具生产率低、设备订购延迟、工具损坏、时间控制系统薄弱、缺乏时间控制信息来监控和分析影响项目绩效的进度估计错误。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信