Integration of design data: interconnection is not enough

K. E. Durk, B.L. Piggott
{"title":"Integration of design data: interconnection is not enough","authors":"K. E. Durk, B.L. Piggott","doi":"10.1109/RMCAE.1992.245511","DOIUrl":null,"url":null,"abstract":"Concurrent engineering has become the buzzword of the 90's. There are frameworks, architectures, tools, standards, and military handbooks all claiming to specify and/or provide a concurrent engineering environment. Most companies are scurrying to \"install\" CE within their companies. However, there are few, if any, large scale success stories to report. Most successes have been limited to small teams, or have been of limited scope. This paper addresses some of the critical issues that have largely been ignored regarding the implementation of CE. It suggests that a new modeling paradigm should be developed as a means to understanding how to best embed CE into our programs.<<ETX>>","PeriodicalId":59272,"journal":{"name":"计算机辅助工程","volume":"48 1","pages":"71-74"},"PeriodicalIF":0.0000,"publicationDate":"1992-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"计算机辅助工程","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/RMCAE.1992.245511","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Concurrent engineering has become the buzzword of the 90's. There are frameworks, architectures, tools, standards, and military handbooks all claiming to specify and/or provide a concurrent engineering environment. Most companies are scurrying to "install" CE within their companies. However, there are few, if any, large scale success stories to report. Most successes have been limited to small teams, or have been of limited scope. This paper addresses some of the critical issues that have largely been ignored regarding the implementation of CE. It suggests that a new modeling paradigm should be developed as a means to understanding how to best embed CE into our programs.<>
设计数据的整合:互联是不够的
并行工程已经成为90年代的流行语。有框架、体系结构、工具、标准和军事手册都声称指定和/或提供并行工程环境。大多数公司都急于在公司内部“安装”CE。然而,很少有大规模的成功案例可以报道。大多数成功都局限于小团队,或者范围有限。本文讨论了一些在实施行政执行方面被忽视的关键问题。这表明,应该开发一种新的建模范式,作为理解如何最好地将CE嵌入到我们的程序中的一种手段。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
2892
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信