Optimization and Short-Circuit Analysis of Photovoltaic Penetration in Off-grid System – A Case Study in Newmont Suriname Gold Mine

Alpha Agustinus, B. Sudiarto
{"title":"Optimization and Short-Circuit Analysis of Photovoltaic Penetration in Off-grid System – A Case Study in Newmont Suriname Gold Mine","authors":"Alpha Agustinus, B. Sudiarto","doi":"10.24036/jptk.v6i2.32023","DOIUrl":null,"url":null,"abstract":"Mining companies are highly dependent on fossil fuels to meet their electricity needs and mining activities such as the use of heavy equipment. Therefore, the greenhouse gas emissions due to burning of fossil fuels have become a major issue related to the impact on the environment due to mining activities. Renewable energy such as Photovoltaic (PV) can be an alternative solution to overcome this problem. This study aims to examine the optimal penetration of Photovoltaic (PV) at Processing Plant Newmont Suriname gold mine. HOMER software is used to design the most optimal Photovoltaic (PV) penetration. ETAP software is used for technical validation through load flow and short-circuit analysis \nKeywords: Hybrid Power Plant, HOMER, ETAP, NPC, COE, Short-circuit","PeriodicalId":55675,"journal":{"name":"Jurnal Pendidikan Teknologi dan Kejuruan","volume":"36 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pendidikan Teknologi dan Kejuruan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24036/jptk.v6i2.32023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Mining companies are highly dependent on fossil fuels to meet their electricity needs and mining activities such as the use of heavy equipment. Therefore, the greenhouse gas emissions due to burning of fossil fuels have become a major issue related to the impact on the environment due to mining activities. Renewable energy such as Photovoltaic (PV) can be an alternative solution to overcome this problem. This study aims to examine the optimal penetration of Photovoltaic (PV) at Processing Plant Newmont Suriname gold mine. HOMER software is used to design the most optimal Photovoltaic (PV) penetration. ETAP software is used for technical validation through load flow and short-circuit analysis Keywords: Hybrid Power Plant, HOMER, ETAP, NPC, COE, Short-circuit
光伏离网系统渗透优化与短路分析——以苏里南纽蒙特金矿为例
矿业公司高度依赖化石燃料来满足其电力需求和采矿活动,如使用重型设备。因此,化石燃料燃烧产生的温室气体排放已成为与采矿活动对环境影响相关的主要问题。光伏(PV)等可再生能源可以成为克服这一问题的另一种解决方案。本研究旨在研究光伏(PV)在苏里南纽蒙特金矿加工厂的最佳渗透。采用HOMER软件设计最优光伏(PV)穿透。关键词:混合动力电厂,HOMER, ETAP, NPC, COE,短路
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
20
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信