M. Thewes, P. Hoffmann, G. Vollmann, I. Kaundinya, A. Lehan
{"title":"Development of a cost model for a more exact estimation of the construction costs of tunnels","authors":"M. Thewes, P. Hoffmann, G. Vollmann, I. Kaundinya, A. Lehan","doi":"10.1201/9780429424441-488","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"43 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"地下工程与隧道","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1201/9780429424441-488","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}