ANALISIS PERAWATAN PERENCANAAN PHASE 25 DI BATAM AERO TECHNIC (BAT) SM-SUB

IF 0.1 0 MUSIC
Raihan Aventa Rakahila, F. Rahmawati
{"title":"ANALISIS PERAWATAN PERENCANAAN PHASE 25 DI BATAM AERO TECHNIC (BAT) SM-SUB","authors":"Raihan Aventa Rakahila, F. Rahmawati","doi":"10.28989/vortex.v4i2.1665","DOIUrl":null,"url":null,"abstract":"Airplanes as a means of transportation are increasingly becoming the flagship of the community. Along with the many flights today, aircraft are not spared also in carrying out maintenance. Punctuality and efficiency of work in maintenance are the main factors so that the aircraft can operate again on time, so that maintenance requires optimizing the number of mechanics according to the workload. While in fact there are still many treatments that are carried out not in accordance with the time that has been determined. This delay is very undesirable by both parties, because it will be detrimental in terms of time and cost. Therefore, careful aircraft maintenance planning and structured work lines must be carried out so that maintenance can be carried out as desired.  The method used is the Critical Path Method (CPM), which is a network critical path method that uses linear time balance. Each activity can be completed faster than normal time by bypassing the activity for a certain fee. In the Critical Path Method (CPM) method, forward calculations and backward calculations are carried out so as to get the results of the critical path (slack). From the results of the analysis, it was found that the value of man hours needed was 89.52 man hours, while the value of man hours needed based on the company's calculation results was 97.43 man hours. There are differences in the results of man hours obtained by the author with from the company.","PeriodicalId":40576,"journal":{"name":"Revista Vortex-Vortex Music Journal","volume":"41 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2023-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista Vortex-Vortex Music Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.28989/vortex.v4i2.1665","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"MUSIC","Score":null,"Total":0}
引用次数: 0

Abstract

Airplanes as a means of transportation are increasingly becoming the flagship of the community. Along with the many flights today, aircraft are not spared also in carrying out maintenance. Punctuality and efficiency of work in maintenance are the main factors so that the aircraft can operate again on time, so that maintenance requires optimizing the number of mechanics according to the workload. While in fact there are still many treatments that are carried out not in accordance with the time that has been determined. This delay is very undesirable by both parties, because it will be detrimental in terms of time and cost. Therefore, careful aircraft maintenance planning and structured work lines must be carried out so that maintenance can be carried out as desired.  The method used is the Critical Path Method (CPM), which is a network critical path method that uses linear time balance. Each activity can be completed faster than normal time by bypassing the activity for a certain fee. In the Critical Path Method (CPM) method, forward calculations and backward calculations are carried out so as to get the results of the critical path (slack). From the results of the analysis, it was found that the value of man hours needed was 89.52 man hours, while the value of man hours needed based on the company's calculation results was 97.43 man hours. There are differences in the results of man hours obtained by the author with from the company.
飞机作为一种交通工具正日益成为社会的旗舰。随着今天的许多航班,飞机也不能幸免于进行维护。维修工作的准时性和效率是保证飞机按时再次运行的主要因素,因此维修需要根据工作量优化机修工的数量。而事实上,仍有许多治疗没有按照已确定的时间进行。这种延迟是双方都不希望看到的,因为这在时间和成本上都是不利的。因此,必须执行仔细的飞机维修计划和结构化的工作线,以便维修可以按预期进行。所使用的方法是关键路径法(Critical Path method, CPM),这是一种利用线性时间平衡的网络关键路径方法。每个活动都可以通过支付一定的费用来绕过活动,比正常时间更快地完成。在关键路径法(CPM)中,通过正演计算和反演计算,得到关键路径(松弛)的结果。从分析结果中发现,所需工时值为89.52工时,而根据公司计算结果得出的所需工时值为97.43工时。笔者与该公司的工时计算结果存在差异。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
20
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信